My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-131B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-131B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 1:07:40 PM
Creation date
8/20/2018 1:46:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/17/2018
Control Number
2018-131B
Agenda Item Number
8.I.
Entity Name
Community Asphalt
Subject
County Road 512 Resurfacing and Shoulder Widening
Contract Documents & Specifications
Area
Myrtle Street to 125th Avenue
Project Number
IRC-1305
Bid Number
2018-009
Alternate Name
CR 512
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the discharge of any hazardous substance to the State Warning Point at 800-320- <br />0519 or 850-413-9911. <br />E. Discharge shall not violate State or local water quality standards in receiving <br />waters, nor cause injury to the public health or to public or private property, nor to <br />the Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory, agency, and the <br />ENGINEER. The receiving point shall be shown on the Project SWPPP. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and <br />treatment systems in accordance with Section 1340. <br />B. Approved Stormwater Pollution Prevention Plan. <br />C. "Contractor's Affidavit Regarding Erosion Control and Treatment of Dewatering <br />Water and Stormwater From Construction Activities" <br />1.5 STORMWATER TREATMENT AND EROSION CONTROL SYSTEM <br />RESPONSIBILITY <br />A. Prepare a site-specific design of the erosion and stormwater pollution control <br />system. Install and maintain all erosion and stormwater pollution control devices <br />under the supervision of a State Certified Stormwater, Erosion, and Sedimentation <br />Control Inspector. Maintain the erosion and stormwater pollution control devices <br />until in the ENGINEER'.s sole opinion, the devices are no longer necessary (such <br />time not to extend past the date the OWNER formally accepts the project as <br />complete). Before beginning construction, submit to Indian River County, Florida <br />Department of Environmental Protection (FDEP) and other applicable regulatory <br />agencies for review and approval, a Stormwater Pollution Prevention Plan <br />(SWPPP), prepared by the certified erosion control subcontractor. Construction <br />shall not begin until the SWPPP has been approved by Indian River County, FDEP, <br />and all applicable regulatory agencies. Submit the approved SWPPP to the <br />ENGINEER before beginning construction. Include in the SWPPP, the <br />"Contractor's Affidavit Regarding Erosion ' Control and Treatment of Dewatering <br />Water and Stormwater From Construction Activities" (located at the end of this <br />Section). <br />1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS <br />DEFINED <br />A. With respect to this Section and as may be further defined in paragraphs 1.6.13, <br />1.6.C, and 1.6:D, "pollution" is the presence in off-site waters of any substances, <br />contaminants, or manmade or human -induced impairment of off-site waters or <br />alteration of the chemical, physical, biological, or radiological integrity of off-site <br />water in quantities or at levels which are or may be potentially harmful or injurious <br />to human health or welfare, animal or plant life, or property. Pollutants to be <br />01025-6 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1305-CR 512 Resurf (SCOP)_Myrtle St to 125th St\Admim\bid <br />documents\Master Contract Documents\Technical Specifications - 100% Submittal - Rev 02_11-06-17.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.