Laserfiche WebLink
PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide <br />manufacturer/supplier's recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br />regardless of the state of completion of the Work, immediately clean all dirt and <br />debris from all pipes and drainage structures; and repair all flooding, washouts, <br />and all other erosion damage to the Work. This responsibility shall not end until <br />Final Acceptance of the Work by the OWNER. Included is damage caused by <br />erosion of any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including <br />Acts of God. Restore all erosion damaged areas to design grades and elevations. <br />Also, refer to General Conditions 6.13.13. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 — Artificial Coverings/Rolled Erosion Control Products - Per <br />Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-10 Technical Specifications <br />FAPublic Works\EN GINEERING DIVISION PROJECTS\1 305 -CR 512 Resurf (SCOP)_Myrtle St to 125th St\Admim\bid <br />documents\Master Contract Documents\Technical Specifications - 100% Submittal - Rev 02-11-06-17.docx <br />