Laserfiche WebLink
Page 1 of 3 <br />�R►v�'� Board of County Commissioners <br />9809 27th Street <br />Vero Beach, Florida 32960-3365 <br />Telephone: (772) 567-8000 <br />�LoRt�A Fax: (772) 778-9391 <br />PRE-BID MEETING MINUTES <br />CR 512 RESURFACING & SHOULDER WIDENING FROM <br />MYRTLE STREET TO 125TH AVENUE <br />PROJECT IRC -1305 FDOT FM No. 433068-1-54-01 <br />June 12, 2018 at 2:00 PM <br />Conference Room Al -303 <br />The following meeting notes set forth our understanding of the discussions and decisions made at the subject <br />meeting. If no objections, questions, additions, or comments are received within three (3) working days from <br />issuance of the meeting notes, we will assume that our understandings are correct. The project will move <br />forward according to the bid plans and specifications and the understandings herein. <br />PROJECT NAME: CR 512 Resurfacing & Shoulder Widening <br />from Myrtle Street to 1251h Avenue <br />PROJECT NUMBER: IRC -1305 <br />BiD NUMBER: 2018009 <br />FM NUMBER: 433068-1-54-01 <br />INTRODUCTIONS/SIGN IN SHEET <br />The meeting was called to order by William Johnson. All parties present identified themselves for <br />the proiect record. See attached sign in sheets for a list of the attendees. <br />William Johnson from the Indian River County Engineering Division stated the requirement as <br />advertised for this meeting to be MANDATORYis being waived due to local traffic delays due <br />to.a vehicular crash. That event was confirmed as preventing attendance by potential <br />bidders. One prospective bidder was in attendance and the County would like to act in good <br />faith and encourage those prospective bidders to submit bids for this project. <br />PROJECT DESCRIPTION: This project will be performed for resurfacing of CR 512 from Myrtle Street to <br />125th Avenue. The proposed improvements will include milling and resurfacing of existing <br />pavement, installation of signal mast arms & associated controllers with video detection, widening <br />paved shoulders, sodding, installation of thermoplastic pavement markings, replacement of <br />sidewalk curb returns for ADA compliance and other ancillary construction work. This is a FDOT <br />Small County Outreach Program (SCOP) funded project, FM No. 433068-1-54-01. <br />P,Public Works\ENGINEERING DIVISION PROJECTS'.1305-CR 512 Resurf (SCOP)_Myrtle St to Lyth St\Adtnim\MectingslPre-Bid\1305_Pre- <br />Bid Meeting Minutes-20180612.doc <br />