Laserfiche WebLink
ORDER NO. PSC -2018 -0316 -PAA -EQ <br />DOCKET NO. 20180083 -EQ <br />PAGE 9 <br />Attachment A <br />T-w-WihThirtccnth Revised Sheet No, 9.032 <br />FLORIDA POWER & LIGHT COMPANY Cancels 94evenilh—welfth Revised Sheet No. 9.032 <br />(Continued from Sheet No. 9.031) <br />(c) I r the Qs is a REF, the QS shall, on an annual basis and within thirty (30) days oiler the anniversary date of this Contract <br />and on an annual basis thereafter for the tent of this Contract. deliver to FPI. a report certified by an officer of the QS: <br />(i) stating lite type and amount of each source of fuel or power used by the QS to produce energy during the twelve <br />month period prior to the anniversary date (the "Contract Year'): and (ii) verifying that one hundred percent (180.5) or <br />all energy sold by the QS to FI't: during the Contract Year complies with Sections i (a) and (b) orthis Contract. <br />(4) trthe QS is a REF, the QS represents and warrants that the Facility meets the renewable energy requirements of Section <br />360.91(2)(a) and (b). Florida Statutes. and FPSC Rules 25-17.210(1) and (2)-. F.A.C., and that the QS shall continue to <br />meet such requirements throughout the term ofthis Contract. FPL shall have the right at all times to inspect the Facility <br />mid to examine any books, records, or other documents of the QS [lint FPI, deems necessary to verify that the Facility <br />meets such requirements. <br />(e) 'rhe Facility (i) has been certified or has self -certified as a "qualifying facility' pursuant to the Regulations of lite Federal <br />Energy Regulatory Commission ("FERC - )2 or (ii) has been certified by the 1-119C as a "qualifying facility' pursuant to <br />Rule 25-17.080(1), A QS that is a qualifving facility with a design capaeity or less than 100 RW shall maintain the <br />"qualifying status' of the Facility throughout the tern of this Contract, FTI. shall have the right at all times to inspect <br />the Facility and to examine any books and records or other documents ofthe Facility that FPI. deans necessary to verify <br />The Facility's qualifying status. On or before March 31 of each year during the term of this Contract, the QS shall <br />provide to FPI_ a certificate signed by an officer or the QS certifying that the Facility has continuously maintained <br />qualifying status. <br />Term of Contract <br />Except as ntbervisc provided herein, this Contract shall become erfectivc immediately upon its execution by the Panics (the <br />"Pffeciive Date") and shall have the termination date stated in Appendix E, unless terminated earlier in accordance with the provisions <br />hereof Notwithstanding lite foregoing, if llie Capacity Delivery Dow (as defined in Section 5.5) of the Facility is not accomplished by the <br />QS be. . ��', ^^'& in- en ice date of the avoided unit, or such later date as may be permitted by FPL pursuant to Section 5 of this <br />Contract. Fill, will be permitted to terminate this Contract consistent with the tents herein without further obligations, duties or liability to <br />the QS. <br />Minimum Specifications <br />Following are the minimum specifications pertaining to this Contract: <br />t. 'I'hc avoided unit (''Avoided Unit") a ian< on which this Contract is based isarg detailed in Appendix <br />Nos. 10.311 through 1(1.31 1.3. <br />This offer shall expire on April 1.2 ".2L-9 <br />3. 'rhe date by which firm capacity And energy deliveries front the QS to FPL shall commence is the in-service date of the <br />Avoided [)nit (or such later date as m,%v be pernined be FPI. pursuant to Section 5 of this contract) unless lite QS chooses it capacity <br />payment option that provides for early capacity payments pursuant to the terms orthis Contract. <br />4. 'Die period of time over which firm capacity and energy shall be delivered from the QS to FPL is as specified in <br />Appendix E: provided. such period shall be no less than a minimum often (10) years after the in-service date orthe Avoided D)nit. <br />5. 7)tc folloNving are the minimum performance standards for the delivery of Finn capacity and energy by the QS to qualify <br />for full capacity payments under this Contract: <br />On Peak' All Hours <br />Availability 94.0% 94.0° <br />: QS Per-Immancc and On Peak hours shall be as measured andfor deseribed in IM's Rate Schedule QS -2 attached hereto as Appendix A <br />(Cominued on Sheet No. 9.032.1) <br />Issued by: S, E. Remi-Tiffam• Cohen, Director, Rates and Tariffs <br />Effective: r-ebwn» 2838 <br />-09 <br />