My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0316 -PAA -EQ <br />DOCKET NO. 20180083 -EQ <br />PAGE 46 <br />Attachment A <br />FLORIDA POWER & LIC:HT C:UMPANY UnWrial Jneet No. 1U.315 <br />APPENDIX D <br />TO THE STANDARD OFFER CONTRACT <br />DETAILED PROJECT INFORMATION <br />Each eligible Contract received by FPL will be evaluated to determine if the underlying QS project is financially and technically viable. The <br />QS shall, to the extent available, provide FPL with a detailed project proposal which addresses the information requested below. <br />1. FACILITY DESCRIPTION <br />• Project Name <br />• Project Location <br />• Street Address <br />• Site Plot Plan <br />• Le gal Description ofSitc <br />• Generating Technology <br />• Facility Classification ( include types from statute) <br />• Primary Fuel <br />• _Alternate Fuel (if applicable) <br />• Committed Capacity <br />• Expected In -Service Date <br />• Steam Host (for cogeneration facilities) <br />• Street Address <br />• Legal Description ofSteam Host <br />• Host's annual steam requirements (lbstyr) <br />• Contact Person <br />• Individual's Name and Title <br />• Company Name <br />• Addnss <br />• Telephone Number <br />• Telecopy Number <br />11. PROJECT PARTICIPANTS <br />• Indicate the entities responsible for the following project management activities and provide a detailed description of the <br />experience and capabilities of the entities: <br />• Project Development <br />• Siting and Licensing the Facility <br />• Designing the Facility <br />• Constructing the Facility <br />• Securing the Fuel Supply <br />• Operating the Facility <br />• Provide details on all electrical generation facilities which arc currently under construction or operational which were <br />developed by the QS. <br />• Describe the financing structure for the projects identified above, including the type of financing used, the permanent financing <br />term, the major lenders, and the percentage o£equity invested at financial closing. <br />(Continued on Sheet No. 10.316) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: May 22, 2007 <br />---0- L4 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.