My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0316 -PAA -EQ <br />DOCKET NO. 20180083 -EQ <br />PAGE 47 <br />FLORIDA POWER & LIGHT CUMPANY <br />(Continued from Sheet No. 10.3M <br />Ill. FUEL SUPPLY <br />Attachment A <br />sheet No. 10.310 <br />• Describe all fuels to be used to generate electricity at the Facility. Indicate the specific physical and chemical characteristics <br />of each fuel type (e.g., Btu content, sulfur content, ash content, etc). Identify special considerations regarding fuel supply <br />origin, source and handling, storage and processing requirements. <br />• Provide annual fuel requirements (AFR) necessary to support the requirements pursuant to Section 366.91, Florida Statutes, <br />and the planned levels of generation and list the assumptions used to determine these quantities. <br />• Provide a summary of the status of the fuel supply arrangements in place to meet the ARFR in each year of the proposed <br />operating life of the Facility. Use the categories below to describe the current arrangement for securing the AFR. <br />Category <br />Description of Fuel Supply Arrangement fuel is from a fully developed <br />owned = <br />source owned by one or more of the project participants <br />contract = <br />fully executed fine fuel contract exists between the developer(s) and fuel supplier(s) <br />LOl = <br />a letter of intent for the fuel supply exists between developer(s) and fuel supplier(s) <br />REF = <br />renewable energy facility will bum biomass, waste, or another renewable resource <br />spot = <br />fuel supply will be purchased on the spot market <br />none = <br />no firm fuel supply arrangement currently in place <br />other = <br />fuel supply arrangement which does not fit any of the above categories (please describe) <br />• Indicate the percentage of the Facility's AFR which is covered by the above fuel supply arrangement(s) for each proposed <br />operating year. The percent of AFR covered for each operating year must total 100%. For fuel supply arrangements identified <br />as owned, contract, or 1.01, provide documentation to support this category and explain the fuel price mechanism of the <br />arrangement. In addition, indicate whether or not the fuel price includes delivery and, ifso, to what location. <br />• Describe fuel transportation networks available for delivering all primary and secondary fuel to the Facility site. Indicate the <br />mode, route and distance of each segment of the journey, from fuel source to the Energy Facility site. Discuss the current <br />status and pertinent factors impacting future availability of the transportation network. <br />• Provide annual Orel transportation requirements (AFTR) necessary to support planned levels of generation and list the <br />assumptions used to determine these quantities. <br />• Provide a summary of the status of the fuel transportation arrangements in place to meet the AFTR in each year of the <br />proposed operating life of the Energy Facility. Use the categories below to describe the current arrangement for securing the <br />AFTR. <br />owned = <br />fuel transport via a fully developed system owned by one or more of the project participants <br />contract = <br />fully executed firm transportation contract exists between the developer(s) and fuel transporters) <br />LOI = <br />a letter of intent for fuel transport exists between developers) and fuel transporters) <br />Spot = <br />fuel transportation will be purchased on the spot market <br />none = <br />no firm fuel transportation arrangement currently in place <br />other= <br />fuel transportation arrangement which does not fit any of the above categories (please describe) <br />• Indicate the percentage of the Facility's AFR which is covered by the above fuel supply arrangement(s) for each proposed <br />operating year. The percent of AFR covered Cor each operating year must total 100%. For fuel supply arrangements identified <br />as owned, contract, or LOI, provide documentation to support this category and explain die transportation price mechanism of <br />the arrangement. <br />• Provide the maximum, minimum, and average fuel inventory levels to be maintained for primary and secondary fuels at the <br />Facility site. List the assumptions used in determining the inventory levels. <br />(Continued on Sheet No. 10317.) <br />Issued by: S E. Romig, Director, Rates and Tariffs <br />Effective: May 22, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.