Laserfiche WebLink
ORDER NO. PSC -2018 -0314 -PAA -EQ <br />DOCKET NO. 20180073 -EQ <br />PAGE 18 <br />Attachment A <br />Page 13 of 71 <br />DUKE SECTION No. IX <br />FOURTH REVISED SHEET NO. 9.412 <br />ENERGY, CANCELS THIRD REVISED SHEET N0.9.412 <br />"Oualifving Facility" or "Q_F" means a cogenerator, small power producer, or non-utility <br />generator that has been certified or self -certified by the FERC as meeting certain ownership, <br />operating and efficiency criteria established by the Federal Energy Regulatory Commission <br />pursuant to the Public Utility Regulatory Policies Act of 1978 ("PURPA"), the criteria for which <br />are currently set forth in 18 C.F.R. § 292, et seq. (2006); Section 210 of PURPA, 16 U.S.C. <br />§ 824-3 (2005), 16 U.S.C. 796 et seg. (2006), and Section 1253 of EPAct 2005, Pub. L. No. <br />109-58, § 1253, 119 Stat. 594 (2005) or, alternatively, analogous provisions under the laws of the <br />State of Florida. <br />"Qualified Institution" means the domestic office of a United States commercial bank or trust <br />company or the United States branch of a foreign bank having total assets of at least ten billion <br />dollars ($10,000,000,000) (which is not an affiliate of either party) and a general long-term <br />senior unsecured debt rating of A- or higher (as rated by Standard & Poor's Ratings Group), or <br />A3 or higher (as rated by Moody's Investor Services). <br />"Rate Schedule COG -1 ".means DEF's Agreement for Purchase of As -Available Energy and/or <br />Parallel Operation with a Qualifying Facility as approved by the FPSC and as may be amended <br />from time to time. <br />"REC" means renewable energy credits, green tags, green tickets, renewable certificates, <br />tradable renewable energy credits (" T-REC") or any tradable certificate that is produced by a <br />renewable generator in addition to and in proportion to the production of electrical energy. <br />"Reduction Value" has the meaning assigned to it in Appendix B. <br />"Remedial Action Plan" has the meaning assigned to it in Section 20.3. <br />-Renewable Facility" or "RF/OF' meats an electrical generating unit or group of units at a <br />single site, interconnected for synchronous operation and delivery of electricity to an electric <br />utility, where the primary energy in British Thermal Units used for the production of electricity <br />is from one or more of the following sources: hydrogen produced from sources other than fossil <br />fuels, biomass; solar energy, geothermal energy, wind energy, ocean energy, hydroelectric power <br />or waste heat from a commercial or industrial manufacturing process. <br />"Required Capacitv Deliver Date'' ntcans the date specified in Appendix E. to the event that no <br />Required Capacity Delivery Date is specified in Appendix E then the RF/QF shall achieve the <br />Capacity Delivery Date on or before the Avoided Unit In -Service Date <br />"RF/OF Entities" has the meaning assigned to it in Section 16, <br />ISSUED BY: Javier Portuondo, Director, Rates B Regulatory Strategy -'FL <br />EFFECTIVE: July 13, 2017 <br />01S <br />