My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0314 -PAA -EQ <br />DOCKET NO. 20180073 -EQ <br />PAGE 19 <br />4 DUKE <br />ENERGY, <br />Attachment A <br />Page 14 of 71 <br />SECTION No. IX <br />THIRD REVISED SHEET NO. 9-413 <br />CANCELS SECOND REVISED SHEET NO. 9.413 <br />"RP/OF Insurance" has the meaning assigned to it in Section 17. <br />"RF/OF Performance Security'' has the meaning assigned in Section 11. <br />"Security Documentation" has the meaning assigned to it in Section 12. <br />"Term" has the meaning assigned to it in Section 3. <br />"Termination Date" means the date upon which this Contract terminates unless terminated earlier <br />in accordance with the provisions hereof. This date is specified in Section 4. <br />"Termination Fee" means the fee described in Appendix B as it applies to any Capacity <br />Payments made under Option 13, C or D. <br />"Termination Security" has the meaning assigned to it in Section 12. <br />"Transmission Provider" means the operator(s) of the Transmission System(s) or any successor <br />thereof or any other entity or entities authorized to transmit Energy on behalf of RF/QF from the <br />Electrical Interconnection Point. <br />"Transmission System" means the system of electric lines comprised wholly or substantially of <br />high voltage lines. associated system protection. system stabilization, voltage transformation, and <br />capacitance, reactance and other electric plant used for conveying electricity from a generating <br />station to a substation, from one generating station to another, from one substation to another, or <br />to or from any Electrical Interconnection Point or to ultimate consumers and shall include any <br />interconnection owned by the Transmission Provider or DEF, but shall in no event include any <br />lines which the Transmission Provider has specified to be part of the Distribution System except <br />for any distribution facilities required to accept capacity and energy from the Facility. <br />ISSUED BY: Javier Portuondo, Director, Rates & Regulatory Strategy . FL <br />EFFECTIVE: July 21. 2015 <br />ra(9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.