Laserfiche WebLink
ORDER NO. PSC -2018 -0314 -PAA -EQ <br />DOCKET NO. 20180073 -EQ <br />PAGE 20 <br />Attachment A <br />Page 15 of 71 <br />j•� DUKE SECTION No. IX <br />SECOND REVISED SHEET NO. 9.414 <br />ENERGY. CANCELS FIRST REVISED SHEET NO, 9,414 <br />2. Facility; Renewable Facility or Qualifying Facility Status <br />The Facility's location and generation capabilities are as described in Table 1 below. <br />TABLE I <br />TECHNOLOGY AND GENERATOR CAPABILITIES <br />Location: Specific legal description (e.g., metes and bounds or <br />other legal description with street address required) <br />City: <br />County: <br />Gencrator Type (Induction or Synchronous) <br />Technology <br />Fuel Type and Source <br />Generator Rating (KVA) <br />Maximum Capability (kW) <br />Net Output (kW) <br />Power Factor (%) <br />Operating Voltage (kV) <br />Peak Internal Load kW <br />The RF/QF's failure to complete Table l in its entirety shall render this Contract null and void <br />and of no further effect. <br />The RF/QF shall use the same .fuel or energy source and maintain the status as a Renewable <br />Facility or a Qualifying Facility throughout the term of this Contract. RF/QF shall at all times <br />keep DEF informed of any material changes in its business which affects its Renewable Facility <br />or Qualifying Facility status. DEF and RF/QF shall have the right; upon reasonable notice of not <br />less than seven (7) Business Days, to inspect the Facility and to examine any books, records, or <br />other documents reasonably deemed necessary to verify compliance with this Contract. In the <br />event of an emergency at or in proximity to the RF/QF site that impacts DEF's system, DEF <br />shall make reasonable efforts to contact the Facility and make arrangements for an emergency <br />inspection. On or before March 31 of each year during the term of this Contract, the RF/QF shall <br />provide to DEF a certificate signed by an officer of the RF/QF certifying that the RF/QF <br />continuously maintained its status as a Renewable Facility or a Qualifying Facility during the <br />prior calendar year. <br />ISSUED BY: Javier Portuondo, Director, Rates & Regulatory Strategy - FL <br />EFFECTIVE: April 29.2013 <br />