My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0314 -PAA -EQ <br />DOCKET NO. 20180073 -EQ <br />PAGE 64 <br />(• DUKE <br />ENERGY. <br />ESTIMATED UNIT FUEL COST <br />Attachment A <br />Page 59 of 71 <br />SECTION No. IX <br />EL EVENU"'ru TW FT REVISED SHEET NO. 9A58 <br />CANCELS ELEVENTH T€#TkLSHEET NO.9A58 <br />As required in Section 25-17.0832, F.A.C., the estimated fiiel costs associated with DEF's <br />Avoided Unit are based on current estimates of the price of natural gas anis will be provided <br />within 30 days of a written request for such projections by any interested person. <br />DELIVERY VOLTAGE ADJUSTMENT <br />DEF's average system line losses are analyzed annually for the prior calendar year, and delivery <br />efficiencies are developed for the transmission, distribution primary, and distribution secondary <br />voltage levels. This analysis is provided in the DEF's Procedures For Changing The Real Power <br />Loss Factor (currently Attachment Q) in its Open Access Transmission Tariff and DEF's fuel <br />cost recovery filing with the FPSC. An adjustment factor, calculated as the reciprocal of the <br />appropriate delivery efficiency factor, is applicable to the above determined energy costs if the <br />RF/QF is within DEF's service territory to reflect the delivery voltage level at which RF/QF <br />energy is received by the DEF. <br />The current delivery voltage adjustment factors are: <br />Delivery Voltaee Adiustment Factor <br />Transmission Voltage Delivery 1.015036 <br />Primary Voltage Delivery 1.025436 <br />Secondary Voltage Delivery 1.062762-1 <br />Payments for firm Capacity are conditioned on the RF/QF's ability to maintain the following <br />performance criteria: <br />A. Capacity Delivery Date <br />The Capacity Delivery Date shall be no later than the Required Capacity Delivery Date. <br />B. Availability and Capacity Factor <br />The Facility's availability and capacity factor are used in the determination of firm <br />Capacity Payments through a performance based calculation as detailed in Appendix A to <br />the Contract. <br />ISSUED BY: Javier Portuondo, MIgggintl Director, Rates 8 Regulatory Strategy- FL <br />EFFECTIVE:u� i 1w 13, 2917 <br />Q 4'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.