My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-149C
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-149C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:35:55 PM
Creation date
9/7/2018 1:08:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/14/2018
Control Number
2018-149C
Agenda Item Number
8 N.N.
Entity Name
MBV Engineering
Subject
Jones Pier Historic Fruit Stand Architectural Services
Area
7770 Jungle Trail
Project Number
Work Order NO. 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - SCOPE OF WORK <br />It is our understanding that the COUNTY intends to reconstruct an approximately 150 SF historic fruit <br />stand at the Jones Pier Historic parcel located at 7770 Jungle Trail, Vero Beach, FL.' <br />The proposed improvements will consist of architectural design services and civil coordination for the <br />design, permitting and CA services for the structures. As such, Donadio & Associates, Architects, P.A. <br />will be retained by MBV Engineering, Inc. to provide the necessary architectural design services for the <br />structure and"a further described below in the Scope of Services. MBV Engineering, Inc. will provide <br />the necessary project oversight and additional civil coordination and plan revisions as necessary to <br />support the architectural plans development and permitting of these structures. A description for each <br />service is provided in below in further detail. <br />FRUIT STAND SCOPE OF SERVICES: <br />Preparation of Construction Documents to include the following: <br />Architectural Design <br />• Establishment of design criteria for the development of the proposed new 150 SF Fruit Stand. <br />• On-site visit for field verification of the existing site conditions. <br />• Preparation of architectural construction documents consisting of floor plans, elevations, roof <br />plans and details, life safety plan, code review, schedules, general/construction details, notes <br />and specifications. <br />• Coordination with Structural. <br />• Coordination with Owners Civil Engineer: <br />• Preparation of Documents for. Building Permit Submittal. <br />• Responding to Building Permit review comments. <br />• Preparation of (1) Cost Estimate <br />Structural Design <br />• Coordination with Donadio & Associates, P.A. <br />• Establish structural design criteria <br />• Review of soil investigative reports as provided by Owner. <br />• Structural Design and preparation of the following: <br />o Foundation plans and sections based on a conventional shallow foundation system <br />o Roof framing plan and sections. <br />o Wind design pressures. <br />• Structural specifications in short format on plans. <br />• Preparation of Documents for Building Permit Submittal. <br />• Responding to Building Permit review comments. <br />• Shop Drawing review of Structural items <br />Civil Design and Oversight <br />Consultant will provide design services to support Architect in development of structure as stated <br />above. Items associated with this task are listed below: <br />• Coordination with project Architect <br />• Coordination with IRC Parks Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.