My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-149C
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-149C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:35:55 PM
Creation date
9/7/2018 1:08:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/14/2018
Control Number
2018-149C
Agenda Item Number
8 N.N.
Entity Name
MBV Engineering
Subject
Jones Pier Historic Fruit Stand Architectural Services
Area
7770 Jungle Trail
Project Number
Work Order NO. 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Attendance at Architectural design meetings with IRC Parks Division <br />• (1) Revision to previously designed Civil documents should Architect and IRC Parks Division <br />deem appropriate <br />• Provide overall project oversight throughout project timeline <br />• Bidding Assistance and Coordination <br />The Consultant will not be responsible for any permit fees associated with the project <br />BIDDING PHASE <br />The COUNTY shall be responsible for setting the providing the front-end bid documents, bid <br />opening date, advertisement of the bid, scheduling the pre-bid meeting, and scheduling the bid <br />opening. The Consultant will provide the following: <br />• Preparation of Documents for Bidding <br />• Attendance at Pre -Bid Meeting and Pre -Construction Meeting <br />All construction specifications will be on the applicable plans in lieu of specifications manual. The <br />Consultant will prepare a pdf file of the final bid package for the COUNTY's use in distribution to <br />prospective bidders via Demandstar. <br />CONSTRUCTION PHASE <br />The Consultant will provide the following scope of services during the construction phase: <br />Architecture <br />Shop Drawing review of Architectural items <br />• Response to Request for Information <br />• (1) visit during construction <br />Structural <br />• Shop Drawing review of Structural items <br />• Response to Request for Information <br />_04-kiyuI: TIV-11W <br />The Consultant shall provide the COUNTY with the following: <br />• Two (2) hard copies 11" x 17" and 24" x 36" formats of the plans <br />• One (1) electronic version of the plans in pdf format <br />• Technical responses for one (1) addenda, as required for clarifying responses from the pre- <br />bid meeting <br />SCHEDULE <br />Upon authorization to proceed by the COUNTY, the above described services will be provided based <br />on the following schedule: <br />• Permit -ready Design Plans 45 days from NTP <br />• Addressing of Permit Agency Comments 14 days from receipt of comments <br />
The URL can be used to link to this page
Your browser does not support the video tag.