My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Deck side lap fasteners shall be driven into the deck rib such that both <br /> panels are penetrated. The side lap fastener shall be located along the <br /> center of the bottom of the rib. <br /> 5. Workers shall apply their weight over the area being fastened to prevent deck <br /> deflection and ensure complete contact between fasteners, deck and/or structural <br /> steel. <br /> 3.05 MISCELLANEOUS <br /> A. Contractor shall monitor the inside of the building at all times during removal and <br /> replacement of damaged steel decking to prevent damage to building, equipment and <br /> occupancy. <br /> B. Contractor acto shall monitor all hot work operations in strict accordance with the Owners <br /> requirements and local Code. These operations include, but are not limited to, cutting, <br /> welding, soldering,brazing,grinding, etc. and any and all other spark or flame producing <br /> operations. • <br /> END OF SECTION 05 3123 <br /> Sebastian Corners Roof Replacement 05 31 23-6 Steel Roof Deck Repair and Securement <br />
The URL can be used to link to this page
Your browser does not support the video tag.