My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Allow coating to dry a minimum of 30 minutes. Coating shall be dry to touch <br /> before roof insulation is installed. <br /> D. Corrosion Degree 4: <br /> 1. Remove all loose dirt, rust, moisture, grease or other contaminants from the <br /> surface with a power wire brush. <br /> 2. Vacuum the roof deck surface clean. <br /> 3. Mechanically attach 1/8"thick deck repair plate to deck ribs with deck to side lap <br /> fasteners 8"on center maximum or a minimum of 2 screws per side. <br /> 4. Properly mix deck repair coating according to manufacturer's recommendations. <br /> 5. Do not mix more material than can be used in the materials expected pot life. <br /> 6. Material should be from 50° F to 90° F for optimum application. <br /> 7. Brush or roller apply deck repair coating as recommended by manufacturer. <br /> 8. Allow coating to dry a minimum of 30 minutes. Coating shall be dry to touch <br /> before roof insulation is installed. <br /> E. Corrosion Degree 5: <br /> 1. Examine underside of steel deck for anyconduit located directlybelow the deck <br /> surface, anything suspended or fastened to the deck surface, etc. If necessary, <br /> detach all objects from the bottom side of the deck to be removed. <br /> 2. Anydeck meetingCorrosion Degree 5 shall be removed in its entirety. <br /> g h' <br /> 3. Provide roof deck where existing is removed. <br /> 4. Overlap all deck end laps no less than 6" and as required to secure through both <br /> panels and into the structural steel. Lap ends only over structural framing. Deck <br /> fasteners shall penetrate deck panels no less than 2" from the edge of the panel. <br /> 5. Overlap all deck side laps to nest flush into neighboring deck panel. Install a <br /> minimum of two deck side lap fasteners. <br /> 6. Workers shall apply their weight over the area being fastened to prevent deck <br /> deflection and ensure complete contact between fasteners, deck and/or structural <br /> steel. <br /> 7. Follow deck Manufacturer's instructions and the latest edition of the Steel Deck <br /> Institute(SDI)Specifications and Commentary. <br /> 3.04 STEEL DECK SECUREMENT <br /> A. Fasten all steel deck panels to steel framing and steel deck side laps as indicated in the <br /> contract drawings. <br /> 1. Field of Roof: Fasten deck to joists 12" on centers, one fastener in every other <br /> deck rib. <br /> 2. Perimeter of Roof: Fasten deck to joists 6" on centers,one fastener in every deck <br /> rib. <br /> 3. Deck Side-Lap Fastening: <br /> a. Install two (2) deck panel side-lap fasteners between joists. Equally <br /> space the fasteners no greater than 30"apart. <br /> 4. Fastener position/location: <br /> a. Deck fasteners shall be driven in the center of the bottom of the deck rib. <br /> The fasteners shall be driven within +/- 1/4" of the center of the <br /> structural steel bearing surface. The fasteners shall be driven along the <br /> center of the structural steel member, not near the edge of the structural <br /> steel. <br /> Sebastian Corners Roof Replacement 05 31 23-5 Steel Roof Deck Repair and Securement <br />
The URL can be used to link to this page
Your browser does not support the video tag.