My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
used. <br /> d. Coarse aggregate: one to two times sum of volumes of cement and lime <br /> used. <br /> e. Sum of volumes of fine and coarse aggregates: Do not exceed four times <br /> sum of volumes of cement and lime used. <br /> 2. Bolt: corrosion resistant threaded J bolt meeting ASTM A 307, Grade A with <br /> ASTM A 563 hex nuts and flat washers,diameter of 1/2". <br /> H. Toggle Bolt: Shall be '/<" diameter toggle bolt consisting of machine screw and spring <br /> wing toggle with flat mushroom head, length as required by conditions. <br /> I. Washers: Fasteners heads for screws, anchors and bolts terminating at the surface of <br /> nailers shall be provided with a minimum 5/8 inch diameter, stainless steel or similar <br /> corrosion resistance flat washer provided by fastener manufacturer, unless washer is <br /> provided from factory as part of the fastener assembly. <br /> PART 3 EXECUTION <br /> 3.01 INSPECTION <br /> A. Contractor shall inspect substrates to receive rough carpentry,and ensure substrates are in <br /> satisfactory condition prior to installation of rough carpentry. <br /> B. Contractor shall inspect all new and existing rough carpentry including fasteners for <br /> material condition before proceeding with installation. Deteriorated, rotted, damaged, <br /> split, warped, twisted or wet materials shall be removed and replaced with specified <br /> materials. <br /> C. Contractor shall remove old cants, tapered edge strips, debris, old fasteners, etc. that <br /> interfere with the installation of new rough carpentry. <br /> D. Contractor shall notify Engineer in writing of unsatisfactory conditions. <br /> E. Commencement of work signifies Contractor's acceptance of substrates. Any defects in <br /> roofing work resulting from such accepted substrates shall be corrected at no additional <br /> expense to the Owner. <br /> 3.02 PREPARATION <br /> A. Steel/Metal Substrates: <br /> 1. Any pressure treated wood to contact steel or metal shall have the steel/metal <br /> coated with a heavy coating of asphalt primer. <br /> B. Roof Deck and Structure: <br /> 1. Roof deck and structure shall be dried and broomed and/or vacuumed clean of <br /> debris and foreign matter prior to installation of the new rough carpentry. <br /> 2. Contractor shall adjust substrates to receive rough carpentry to ensure completed <br /> rough carpentry installation is acceptable for roofing and sheet metal flashings. <br /> 3. Steel decking shall be coated with a uniform,heavy application of asphalt primer, <br /> or separated by membrane or other acceptable means to prevent contact between <br /> steel and treated wood products. <br /> Sebastian Corners Roof Replacement 06 10 00-6 Rough Carpentry <br />
The URL can be used to link to this page
Your browser does not support the video tag.