My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. 6 inches Length at both ends of precut extension. <br /> ii. Outside Diameter to be 1/4" less than outside diameter of soil <br /> pipe. <br /> c. Length: <br /> i. Overall Length: 28 inches. <br /> ii. Net Usable Length: 16 inches excluding Splice Sleeve Inserts. <br /> d. Sealant: Single-Component, Nonsag, Urethane Joint Sealant: ASTM C <br /> 920, Type S, Grade NS, Class 25, for Use NT, and acceptable to roofing <br /> membrane manufacturer. <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Survey existing conditions to determine extent of demolition. <br /> B. Record the conditions of items to be removed/reinstalled and items to be re- <br /> moved/salvaged. <br /> C. Contractor shall not remove any element that may result in structural deficiency or col- <br /> lapse of any part of the structure or adjacent structures during demolition. <br /> D. Contractor to inspect substrate for soundness and notify Engineer in writing of any defi- <br /> ciencies. Commencement of work signifies Contractor's acceptance of site conditions. <br /> 3.02 UTILITIES/SERVICES <br /> A. Maintain existing utilities that are to remain in service and protect them against damage <br /> during selective site demolition unless authorized in writing by the Owner and authorities <br /> having jurisdiction. <br /> 1. Locate all conduits and equipment attached to the underside of the decking prior <br /> to reroofing. Insulation fastener locations are not to disturb existing conduits or <br /> interior components/equipment. <br /> 2. If utilities serving occupied portions of the site must be shut down, temporary <br /> services shall be provided. <br /> 3. Provide 72 hours notice to Owner if shut down is required. <br /> 4. Where services are to be removed, relocated or abandoned, provide necessary <br /> bypass connections to remaining occupied buildings and areas. <br /> 3.03 PREPARATION <br /> A. Do not begin demolition until utilities have been disconnected/sealed and have been veri- <br /> fied as such in writing. <br /> B. Do not close off or obstruct streets, walks or other adjacent occupied facilities without <br /> permission from Owner and authorities having jurisdiction. <br /> C. Provide safe conditions for pedestrians. Erect temporary protection such as walkways, <br /> fences,railings and canopies as required by OSHA and other governing authorities. <br /> Sebastian Corners Roof Replacement 07 01 50-3 Preparation for Reroofing <br />
The URL can be used to link to this page
Your browser does not support the video tag.