My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Provide protection for adjacent building, appurtenances and landscaping to remain. Erect <br /> temporary fencing around trees to remain. <br /> E. Provide temporary weather protection as required to prevent water leakage and damaged <br /> to exterior or interior of adjacent structures. <br /> 3.04 POLLUTION CONTROLS <br /> A. Use water, mist, temporary enclosures and other suitable methods to limit the spread of <br /> P �' P <br /> dust and dirt.Comply with local EPA regulations. <br /> 1. Do not use water where damage may occur or where hazardous conditions would <br /> be created such as ice or flooding. <br /> 3.05 REMOVALS <br /> A. Demolish and remove existing construction only to the extent required by new construc- <br /> tion. <br /> B. Remove all existing roofing,roof insulation,membrane and sheet metal and discard. <br /> C. Remove or correct any obstruction which might interfere with the proper application of <br /> new materials. <br /> D. Lift or remove all existing equipment so that existing flashings can be totally removed <br /> and new flashings installed. <br /> E. Remove debris from existing materials to provide clean,dry substrate. <br /> F. Demolish concrete and masonry in small sections. Cut concrete and masonry at juncture <br /> with construction to remain using powered masonry saw, core drill or hand tools. Do not <br /> use powered impact tools. <br /> G. Remove and transport debris in a manner that will prevent damage/spills to adjacent <br /> buildings and areas. <br /> H. Dispose of demolished items and materials on a daily basis. On-site storage of removed <br /> items is not permitted. <br /> I. Transport demolished materials off-site and dispose of materials in a legal manner. <br /> J. Perform progress inspections to detect hazards resulting from demolition activities. <br /> 3.06 FLASHING HEIGHTS <br /> A. Permanently raise roof top equipment as required to achieve 8"minimum flashing height. <br /> B. Provide additional wood blocking to top of parapet walls and expansion joints to achieve <br /> minimum 8"flashing height. <br /> C. Extend all existing sanitary vents to height required by the applicable Plumbing Code,but <br /> no less than 8 inches and no more than 12 inches above the finished roof system. Refer <br /> to Soil Pipe Extension as indicated below. <br /> Sebastian Corners Roof Replacement 07 01 50-4 Preparation for Reroofing <br />
The URL can be used to link to this page
Your browser does not support the video tag.