My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.07 SOIL PIPE EXTENSION <br /> A. Preparation <br /> 1. Remove existing flashing from plumbing vent piping to extent required to enable <br /> installation of new plumbing vent pipe extensions and completion of flashings. <br /> 2. Clean plumbing vent piping to ensure that joint surfaces are clean, dry, and free <br /> from contamination including dirt, oils, grease,tar, wax, rust,and other substanc- <br /> es that may inhibit adhesive or sealant performance. <br /> B. Installation <br /> 1. Insert end of plumbing vent pipe extension into existing plumbing vent piping. <br /> a. Verify circumference of existing plumbing vent piping and plumbing <br /> vent pipe extension is appropriate to achieve secure,rigid installation. <br /> b. Mark plumbing vent pipe extension at required height above finished <br /> roof surface level,and cut to required length. <br /> c. Apply adhesive or sealant to plumbing vent piping as appropriate to ex- <br /> isting pipe material and plumbing vent pipe extension, and mate plumb- <br /> ing vent pipe extension to existing piping. Apply adequate adhesive or <br /> sealant to achieve secure,rigid installation. <br /> 3.08 SCUPPER INSTALLATION <br /> A. Locate bottom of overflow scupper 2 inches above surface of the roof system. <br /> B. Remove existing masonry and store for reuse if in good condition. Reinstall masonry <br /> units to extent possible. Provide new brick or concrete masonry units to match existing. <br /> C. Extend opening through entire thickness of parapet. Take precautions to avoid damaging <br /> adjacent wall surfaces. <br /> D. Provide finished openings as indicated. <br /> E. Install veneer materials of same type, size and finish to match existing. Set units in full <br /> beds of mortar to match adjacent joints in thickness. Tool joints to match. <br /> F. Repair exterior finish to match adjacent surfaces. <br /> 3.09 FASTENER WITHDRAWAL TESTS <br /> A. Conduct fastener pull tests in accordance with ANSI/SPRI FX-1-2016 requirements. Per- <br /> form a minimum of 5 pull tests per individual roof area. Provide a report along with a <br /> roof plan showing test locations and corresponding withdrawal value of each pull test. <br /> Minimum withdrawal value to be 180 pounds. Testing to be performed either by manu- <br /> facturer of fasteners tested or by roof manufacturer. <br /> 3.10 CLEANING <br /> A. Inspect the site daily and clean up debris and hazards at the end of each day. Adjacent <br /> roads, drives and walkways shall remain in operation and free from construction materi- <br /> als debris. <br /> Sebastian Corners Roof Replacement 0701 50-5 Preparation for Reroofing <br />
The URL can be used to link to this page
Your browser does not support the video tag.