My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Tapered Insulation <br /> 1. Install tapered insulation system to provide positive slope for complete roof <br /> drainage. <br /> 2. Crickets shall be sized as shown in the Contract Drawings. Modifications shall <br /> be provided to ensure positive slope and prevent standing water along the cricket <br /> valley. <br /> a. Minimum length to width ratio shall be 2:1. Fabricate partial crickets <br /> with dimensions which would result in a minimum length to width ratio <br /> of 2:1 if they were extended to full size. <br /> b. Unless otherwise noted, fabricate all crickets from tapered stock as <br /> required to provide the specified minimum slope. For example, when <br /> roof slope is indicated as 1/4" per foot minimum, fabricate crickets with <br /> slope of 1/2"per foot minimum. <br /> c. Construct crickets on up slope side of all curbs to ensure positive <br /> drainage. <br /> d. Install tapered edge strips at cricket edges to provide a smooth transition <br /> between the cricket and insulation system below. <br /> 3. Insulation boards may require mechanical fasteners and stress plates at slope <br /> transition of crickets to minimize bridging. <br /> C. Roof Drainage: <br /> 1. Drainage sumps shall be installed as detailed. <br /> 2. The Contractor shall be responsible for carefully laying out the tapered <br /> insulation, sumps, drain bowls and scuppers to ensure the finished roof provides <br /> complete drainage with no standing water. <br /> 3. Contractor shall fabricate miter-cut sumps at scuppers to provide smooth <br /> transitions between the insulation system and the drains/scuppers. <br /> 4. Sumps shall ensure complete roof drainage and prevent water dams. <br /> 5. Contractor shall adjust insulation, drains and scuppers to ensure complete roof <br /> drainage and satisfactory substrates for membrane and flashings. <br /> 6. Drain sump components shall be fastened to the deck using specified insulation <br /> fasteners or adhesives. <br /> 7. Circular sumps and sumps that do not provide smooth transition or that create <br /> standing water at the drains shall be rejected and shall require removal and <br /> replacement. <br /> D. Insulation Mechanical Attachment <br /> 1. Fastener quantity and spacing shall be as indicated in the Contract Drawings. <br /> 2. Fasteners shall be installed using manufacturer's recommended equipment and in <br /> accordance with the manufacturer's requirements. <br /> 3. Fasteners and stress plates shall be set secure and tight against the insulation <br /> surface,and shall not be over-driven. <br /> 4. Fasteners shall engage the top flange of steel decks only. <br /> END OF SECTION 07 22 16 <br /> Sebastian Corners Roof Replacement 07 22 16-5 Roof Insulation <br />
The URL can be used to link to this page
Your browser does not support the video tag.