My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Bar-Rust 231 as manufactured by Devoe <br /> c. High Build Epoxy Mastic as manufactured by Duron <br /> d. P45 Epoxy Mastic Coating as manufactured by Benjamin Moore&Co. <br /> D. Hat Channel Sub Framing: <br /> 1. 5/8" x 5-1/2", 16 gauge,stainless steel hat channel. <br /> E. Sheet Metal Underlayment: Refer to Section 07 62 00-Sheet Metal Flashing and Trim. <br /> F. Backer Rod: Refer to Section 07 62 00-Sheet Metal Flashing and Trim. <br /> G. Sealant: Refer to Section 07 62 00-Sheet Metal Flashing and Trim. Sealant color to match <br /> wall panel. <br /> H. Metal Wall Panel Closures: Refer to Section 07 62 00-Sheet Metal Flashing and Trim. <br /> 2.04 FABRICATION OF SHEET METAL WALL PANELS <br /> A. All steel to be correctively leveled and handled to minimize stress and waviness of sheet <br /> steel. <br /> B. Form and fabricate sheets, seams, strips, edge treatments, integral flashings, and other <br /> components of the metal wall panel to the profiles,patterns,and drainage arrangements as <br /> determined by Engineer,to provide permanent leakproof construction,with no oil canning <br /> or panel distortion. <br /> 1. Fabricate panels in full lengths with no end laps. <br /> 2. Fabricate exposed items of prefinished sheet metal,color to match panels. <br /> 3. Hem exposed edges on underside 1/2 inch(12 mm)miter and seam corners. <br /> 4. Provide for thermal expansion and contraction of the Work. <br /> 5. Seal joints to achieve leak proof construction per manufacturer's detail. <br /> C. Fabricate vertical faces with bottom edge formed outward 1/4 inch and hemmed to form <br /> drip. <br /> D. Unless otherwise shown on drawings or specified herein, panels shall be full length. <br /> Fabricate flashings and accessories in longest practical lengths. <br /> E. Wall panels shall be factory formed.Field formed panels are not acceptable. <br /> 2.05 FINISH <br /> A. Exterior Finish: <br /> 1. Full 70 percent Kynar 500/Hylar 5000 for a total 1.0 mil dry film thickness with a <br /> specular gloss of 10-15 percent when tested in accordance with ASTM D523 at 60 <br /> degrees. <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Substrate: <br /> 1. <br /> Examine substrate to ensure that is properly secured and prepared to receive metal <br /> Sebastian Corners Roof Replacement 07 42 13-4 Metal Wall Panels(Screen Wall) <br />
The URL can be used to link to this page
Your browser does not support the video tag.