My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
evaporation rate provided by membrane manufacturer. <br /> N. Walkway Pad: Shall be walkway pad by manufacturer of membrane. <br /> O. Pre-Fabricated Expansion Joint: Shall be manufacturer's approved pre-fabricated <br /> expansion joint made with polyester reinforced membrane,neoprene foam and galvanized <br /> metal. <br /> P. Polymer Clad Metal: Refer to Section 07 62 00-Sheet Metal Flashing and Trim <br /> PART 3 EXECUTION <br /> 3.01 SUBSTRATE PREPARATION <br /> A. Verify that the substrate is dry, clean, smooth, and free of loose material, oil, grease, or <br /> other foreign matter. Sharp ridges and other projections and accumulations of bitumen <br /> shall be removed to ensure a smooth surface before roofing. <br /> B. Asphalt roofing substrates shall be removed, covered, or flashed using compatible, <br /> approved materials. PVC shall not come in contact with substrates containing asphalt <br /> materials. <br /> C. Any deteriorated substrate shall be repaired. <br /> D. Beginning installation means acceptance of prepared substrate. <br /> E. Provide necessary protection from adhesive vapors to prevent interaction with foamed <br /> plastic insulation. <br /> 3.02 MEMBRANE INSTALLATION(SCREWS AND PLATES) <br /> A. General <br /> 1. Membrane is to be attached with membrane fasteners and plates according to <br /> membrane manufacturer's requirements. <br /> 2. Membrane overlaps shall be shingled with the flow of water. <br /> 3. Full-width rolls of membrane shall be fastened perpendicular to the direction of <br /> the steel deck flutes. <br /> 4. Tack welding of membrane rolls for purposes of temporary restraint during <br /> installation is not permitted. <br /> B. Perimeter and Corner Areas <br /> 1. Over the properly installed and prepared substrate surface, half-width rolls (60" <br /> width) are to be installed either parallel or perpendicular to the entire perimeter <br /> edge. Membrane fasteners and plates are installed along the edge of the membrane <br /> on the fastening line six(6")inches on center. Plate is held back 1 inch from the <br /> outer edge of the membrane. The adjacent half-roll is positioned to overlap the <br /> fastened edge of the first half-roll by 5-1/2 inches in accordance with the overlap <br /> lines marked on the sheet's edge. The 5-1/2 inch overlap will allow the top <br /> membrane to extend 2-1/2 inches past the membrane fastener and plate for heat- <br /> welding. Fasteners shall clamp the membrane tightly to the substrate. In corner <br /> areas where perimeter half-rolls intersect, add rows spaced 54-1/2" on center of <br /> membrane fasteners and plates over the top of the half-rolls and weld a coverstrip <br /> above them for watertightness. <br /> Sebastian Corners Roof Replacement 07 54 00-6 Thermoplastic Single Ply Roofing <br />
The URL can be used to link to this page
Your browser does not support the video tag.