Laserfiche WebLink
be removed and replaced at the Contractor's expense. <br /> 3.07 CLEANING AND PROTECTION <br /> A. The Contractor shall be responsible for protecting the roof from construction related <br /> damages during the Work. <br /> B. The Contractor shall ensure trash and debris is removed from the roof daily. <br /> C. Metal scraps, nails, screws and other sharp damaging debris shall be kept off of the roof <br /> membrane surface during construction. <br /> D. The Contractor shall clean off/remove excess adhesive, sealant, stains and residue on the <br /> membrane and flashing surfaces. <br /> E. The Contractor shall repair or remove and replace damaged membrane,flashings and other <br /> membrane components. Repairs shall be approved bythe Engineer and be in accordance <br /> P P PP g <br /> with the membrane manufacturers repair instruction to comply with the specified warranty. <br /> F. The Contractor shall remove temporary coverings and masking protection from adjacent <br /> work areas upon completion. <br /> END OF SECTION 07 54 00 <br /> Sebastian Corners Roof Replacement 07 54 00-10 Thermoplastic Single Ply Roofing <br /> II <br />