My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 07 62 00 <br /> SHEET METAL FLASHING AND TRIM <br /> PART 1 GENERAL <br /> 1.01 WORK INCLUDED <br /> A. Fabrication and installation of new sheet metal flashings and trim to provide a permanently <br /> watertight condition. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section, including but not limited to: <br /> 1. Rough Carpentry Section 06 10 00 <br /> 2. Thermoplastic Single Ply Roofing Section 07 54 00 <br /> 1.03 REFERENCES <br /> A. Refer to the following references for specification compliance: <br /> 1. Florida Building Code(FBC) <br /> 2. ASTM International <br /> 3. National Roofing Contractors Association(NRCA) <br /> 4. Sheet Metal and Air Conditioning Contractors National Association(SMACNA) <br /> a. Architectural Sheet Metal Manual,Seventh Edition—January,2012 <br /> 5. ANSI/SPRI ES-1 <br /> 1.04 SUBMITTALS <br /> A. Refer to Section 01 33 00-Product Submittals for Submittals. <br /> B. Manufacturer's Product Data Sheets for all materials specified certifying material complies <br /> with all specified requirements. <br /> C. Pre-finished sheet metal and sealant color chart. <br /> D. Shop Drawings for any transitions and/or terminations not depicted in Contract Drawings. <br /> 1.05 MOCK-UPS <br /> A. Provide mock-ups of the following sheet metal components prior to fabrication of the <br /> components: <br /> 1. Coping:Provide minimum 10'length of coping mock-up including any applicable <br /> fascia covers. Mock-up shall include at least one seam of the configuration <br /> specified. <br /> 2. Gutter: Provide mock-up of gutter, gutter bracket and gutter hanger. Mock-up <br /> shall include one lap in gutter section. <br /> 3. Metal Edge and Fascia Cover: Provide minimum 10' length of metal edge and <br /> fascia cover. Include at least one lap of each component. <br /> Sebastian Corners Roof Replacement 07 62 00-1 Sheet Metal Flashing and Trim <br />
The URL can be used to link to this page
Your browser does not support the video tag.