My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.06 QUALITY ASSURANCE <br /> A. Installation shall comply with the Contract Drawings. References to figures are from <br /> SMACNA Architectural Sheet Metal Manual, Seventh Edition—January,2012. <br /> B. Ensure work is free of leaks in all weather conditions. <br /> C. Fabricate metal edge (where no gutter is present) and coping in accordance with <br /> ANSI/SPRI ES-1 requirements. <br /> D. Workmanship shall be first-class in every respect. The sheet metal work shall be assembled <br /> and secured in accordance with these specifications,the manufacturer's requirements and <br /> referenced standards. <br /> 1.07 DELIVERY,STORAGE AND HANDLING <br /> A. Delivery: Deliver materials in the manufacturer's original sealed and labeled containers <br /> and in quantities required to allow continuity of application. <br /> B. Storage: Store materials within areas designated or approved by the Owner. Ensure <br /> materials remain dry,covered and not in contact with the ground. <br /> C. Handling: Handle material in such manner as to preclude damage and contamination with <br /> moisture or foreign matter. <br /> 1.08 PROJECT CONDITIONS <br /> A. Environmental: Protect building and its components from the elements at all times during <br /> the project. <br /> B. Coordination and Scheduling: Coordinate all phases of work to allow continuity of work <br /> without delays. <br /> 1.09 WARRANTY <br /> A. Contractor to provide the pre-finished sheet metal manufacturer's thirty (30) year finish <br /> warranty from the date of substantial completion. <br /> B. Provide certification of air-dried kynar paint or powder coating for specified materials. <br /> PART 2 PRODUCTS <br /> 2.01 PRE-FINISHED STEEL <br /> A. Galvalume coated steel meeting or exceeding AZ50 per ASTM A792. Manufacturer's <br /> smooth finish, pre-finished color coatings consisting of full strength 70% Kynar 500 <br /> fluorocarbon(Polyvinylidene Fluoride PVF2)coating over a urethane primer on the finish <br /> side,with primer and a wash coat on the reverse. All measurements per NCCA Technical <br /> Bulletin II-4 or ASTM D1005. A strippable plastic film should protect the finish during <br /> fabrication and installation. Manufacturer's standard color to be selected by Owner. <br /> 1. 24 gauge <br /> a. Slip Flashing <br /> b. Receiver Flashing <br /> Sebastian Corners Roof Replacement 07 62 00-2 Sheet Metal Flashing and Trim <br />
The URL can be used to link to this page
Your browser does not support the video tag.