My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Front edge of collector head shall be 1"below scupper. <br /> J. Metal Edge(Thermoplastic) <br /> 1. Fabricate metal edge as shown in detail drawings in 10' lengths. Refer to <br /> SMACNA Architectural Sheet Metal Manual Figure 2-1 except for continuous <br /> cleat dimensions which shall be as shown in Contract Drawings. <br /> a. Fabricate without vertical gravel stop at drainage edges and%inch vertical <br /> gravel stop at non-drainage edges. <br /> 2. Terminate membrane at roof edge and hot-air weld flashing membrane strip to <br /> extend down the outside vertical face over the wall. <br /> 3. Provide sealant tape at base of flashing membrane on outside of wall to prevent <br /> moisture infiltration. <br /> 4. Install a continuous cleat over fascia cover as indicated in detail drawings fastened <br /> to substrate 6"on center. Locate fasteners no greater than 2"from the bottom hem. <br /> 5. Lock metal edge onto continuous cleat and secure flange of metal edge to wood <br /> blocking 3"on center staggered and not within %2"from inside edge and 3/<"from <br /> outside edge. <br /> 6. Strip flange of metal edge with hot-air welded stripping membrane as specified in <br /> the Contract Drawings. <br /> 7. Hand tong all of metal edge onto continuous cleat. <br /> 8. Metal Edge Joints: <br /> a. Leave a 1/4" opening between metal edge sections. Install two roofing <br /> nails in the end of the flange,and one roofing nail in the end of the vertical <br /> face of each metal edge section. <br /> b. Center aluminum tape over entire joint opening(flange and face). <br /> c. Hot-air weld 4"wide strip of stripping membrane over entire joint. <br /> d. Strip in flange of metal edge as described above. <br /> e. Center 6"wide cover plate over joint locking onto notched drip edges of <br /> metal edge sections.Refer to SMACNA Architectural Sheet Metal Manual <br /> Figure 2-5A,and Figure 2-5,Detail 1. <br /> f. Strip flange of cover plate with hot-air welded flashing membrane. <br /> Flashing membrane shall extend 2"beyond the cover plate flange on 3 <br /> interior sides. <br /> K. Gutters <br /> 1. Fabricate to profile shown in Contract Drawings. Refer to SMACNA <br /> Architectural Sheet Metal Manual Figure 1.2 Style D. <br /> 2. Gutters shall be continuous, roll formed from coil stock on site or formed in 10' <br /> lengths. <br /> a. Joints in gutters must be lapped a minimum of 1 inch, riveted 1 inch on <br /> center. Install sealant tape between gutter sections and sealant at exposed <br /> inside edge and on rivets. Lap joints in the direction of water flow. <br /> 3. Terminate membrane at roof edge and hot-air weld flashing membrane strip to <br /> extend down the outside vertical face of wall. <br /> 4. Provide butt type expansion joints in gutters at spacing appropriate for the type <br /> material used to fabricate gutters. Refer to SMACNA Architectural Sheet Metal <br /> Manual Figure 1-7. Maximum length of gutters shall be 50'. <br /> Sebastian Corners Roof Replacement 07 62 00-8 Sheet Metal Flashing and Trim <br />
The URL can be used to link to this page
Your browser does not support the video tag.