My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 PRODUCTS <br /> 2.01 MATERIALS <br /> A. Access Ladder <br /> 1. Fixed Steel Ladder: Fixed ladder of appropriate length with walk-thru hand rails, <br /> welded one-piece construction,gray powder coat finish such as: <br /> a. Cotterman Model FW <br /> b. O'Keefe's Inc. 502 Tubular Rail Low Parapet Access Ladder with Roofo- <br /> ver Rail Extensions <br /> c. Gillis Fixed Access Ladder <br /> 2. Fixed Steel Ladder Anchors: Minimum 1/2 inch diameter, corrosion resistant <br /> threaded rods supplied by the anchoring system manufacturer. Screen for hollow <br /> masonry provided by fastener manufacturer. Corrosion resistant nut and 1-1/2" <br /> diameter flat washer. Acceptable manufacturers include: <br /> a. Powers Fasteners,Inc.Chem-Fast Anchoring System <br /> b. Powers Fasteners,Inc.AC100 Anchoring System <br /> c. ITW Ramset Epcon System <br /> B. Pipe Support:Smooth EPDM rubber pipe support sized to fit the diameter of the pipe being <br /> supported and height adjustable. Acceptable products include: <br /> 1. Olympic Olyflow PipeGuard <br /> 2. Erico Caddy Pyramid EZ Series <br /> 3. Portable Pipe Hangers <br /> 4. Miro Industries <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Verification of Conditions: Examine subsurfaces to receive Work and report detrimental <br /> conditions in writing to Architect. Commencement of Work will be construed as ac- <br /> ceptance of subsurfaces. <br /> B. Coordination: Coordinate with other Work which affects, connects with, or will be con- <br /> cealed by this Work <br /> 3.02 INSTALLATION <br /> A. Ladder: <br /> 1. Drill 5/8"diameter hole a minimum of 2-1/2"into masonry wall using the appro- <br /> priate drill bit. <br /> 2. Use brush and/or compressed air to remove all dust and debris from hole. <br /> 3. Insert HIT-S Screen tube into hole and fill to front edge of screen with HY 20 <br /> adhesive(minimum 1 pump for S12 screen tube). <br /> 4. Insert HIT-A Rod into adhesive-filled screen, twisting slightly. Fastener may be <br /> adjusted during specified gel time. Do not disturb fastener between specified gel <br /> and cure time. <br /> Sebastian Corners Roof Replacement 07 72 00-2 Roof Accessories <br />
The URL can be used to link to this page
Your browser does not support the video tag.