Laserfiche WebLink
PART 2 PRODUCTS <br /> 2.01 MATERIALS <br /> A. Access Ladder <br /> 1. Fixed Steel Ladder: Fixed ladder of appropriate length with walk-thru hand rails, <br /> welded one-piece construction,gray powder coat finish such as: <br /> a. Cotterman Model FW <br /> b. O'Keefe's Inc. 502 Tubular Rail Low Parapet Access Ladder with Roofo- <br /> ver Rail Extensions <br /> c. Gillis Fixed Access Ladder <br /> 2. Fixed Steel Ladder Anchors: Minimum 1/2 inch diameter, corrosion resistant <br /> threaded rods supplied by the anchoring system manufacturer. Screen for hollow <br /> masonry provided by fastener manufacturer. Corrosion resistant nut and 1-1/2" <br /> diameter flat washer. Acceptable manufacturers include: <br /> a. Powers Fasteners,Inc.Chem-Fast Anchoring System <br /> b. Powers Fasteners,Inc.AC100 Anchoring System <br /> c. ITW Ramset Epcon System <br /> B. Pipe Support:Smooth EPDM rubber pipe support sized to fit the diameter of the pipe being <br /> supported and height adjustable. Acceptable products include: <br /> 1. Olympic Olyflow PipeGuard <br /> 2. Erico Caddy Pyramid EZ Series <br /> 3. Portable Pipe Hangers <br /> 4. Miro Industries <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Verification of Conditions: Examine subsurfaces to receive Work and report detrimental <br /> conditions in writing to Architect. Commencement of Work will be construed as ac- <br /> ceptance of subsurfaces. <br /> B. Coordination: Coordinate with other Work which affects, connects with, or will be con- <br /> cealed by this Work <br /> 3.02 INSTALLATION <br /> A. Ladder: <br /> 1. Drill 5/8"diameter hole a minimum of 2-1/2"into masonry wall using the appro- <br /> priate drill bit. <br /> 2. Use brush and/or compressed air to remove all dust and debris from hole. <br /> 3. Insert HIT-S Screen tube into hole and fill to front edge of screen with HY 20 <br /> adhesive(minimum 1 pump for S12 screen tube). <br /> 4. Insert HIT-A Rod into adhesive-filled screen, twisting slightly. Fastener may be <br /> adjusted during specified gel time. Do not disturb fastener between specified gel <br /> and cure time. <br /> Sebastian Corners Roof Replacement 07 72 00-2 Roof Accessories <br />