Laserfiche WebLink
5. Install fixed steel ladder and secure to HIT-A Rods with washers and nuts. Do not <br /> exceed maximum torque on anchors. <br /> B. Pipe Supports <br /> 1. Provide pipe supports at all rooftop gas,electrical conduit and condensation lines <br /> with a 5' maximum spacing. <br /> 2. Provide new PVC condensation lines with integral P-trap on HVAC units. <br /> 3. Route condensation lines to nearest drainage point(i.e.roof drain,gutter,or scup- <br /> per). <br /> 3.03 CLEANING <br /> A. During the course of the Work and on completion,remove and dispose of excess materials, <br /> equipment and debris away from premises. <br /> END OF SECTION 07 72 00 <br /> Sebastian Corners Roof Replacement 07 72 00-3 Roof Accessories <br />