Laserfiche WebLink
SECTION 01215 <br /> GENERAL QUALITY CONTROL <br /> 1.5 PROJECT PHOTOGRAPHSNIDEOS <br /> A. The CONTRACTOR shall make provisions, at his expense,for photographs and video <br /> tapes of all work areas just prior to construction, and for unusual conditions during <br /> construction. The photographs and videos shall show pertinent physical features along <br /> • the line of construction. The purpose of the videos is to determine any damage to <br /> Private or public property <br /> duringconstruction. The video must be performed by a <br /> professional videographer. <br /> B. Pre-Construction Photographs and Video: <br /> 1. Contractor shall provide the Owner with photographs and video record and one <br /> copy of the existing conditions prior to construction. These photographs and <br /> videos shall be a standard DVD format and shall be narrated. <br /> 2. The photographs and video shall include, but not be limited to, the following items <br /> shown in a clear manner: <br /> 1) All existing features within the right-of-way. <br /> 2) All existing features within the temporary construction easement. <br /> 3) All existing features within permanent easements. <br /> 4) All existing features adjacent to any construction. <br /> 3. Detail of the photographs and video shall be such that the following examples <br /> shall be clear and visible: <br /> 1) Cracks in walls. <br /> 2) Condition of fencing. <br /> 3) Condition of planted areas and types of vegetation. <br /> 4) Condition of sodded areas. <br /> 5) Conditions of sprinkler systems and associated controls and wiring. <br /> 6) Condition of signs. <br /> 7) Conditions of lighting and associated wiring. <br /> 8) Significant detail of any pre-existing damages physical features shall be <br /> shown. The coverage of the photographs and video should include the <br /> limits of effects of the use of vibratory rollers. <br /> 9) These photographs and video record shall be presented and approved <br /> by the Owner prior to the Notice to Proceed. A copy shall be kept in the <br /> Contractor's field office. <br /> 10)Payment— No additional payment will be made for this work.. <br /> + + END OF SECTION + + <br /> 01215-2 01215 General Quality Control <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br /> Contract Documents\Master Contract Documents\01215 General Quality.doc <br />