My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310 <br /> CONSTRUCTION SCHEDULES <br /> 1.1 GENERAL REQUIREMENTS <br /> A. No partial payments shall be approved by the ENGINEER until there is an <br /> approved construction progress schedule on hand. <br /> B. Designate an authorized representative who shall be responsible for <br /> development and maintenance of the schedule and of all progress and <br /> payment reports. This representative shall have direct project control and <br /> complete authority to act on behalf of the CONTRACTOR in fulfilling the <br /> commitments of the CONTRACTOR's schedules. <br /> • <br /> 1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES <br /> When the ENGINEER requires the CONTRACTOR to submit revised (updated) <br /> progress schedules on a monthly basis the CONTRACTOR shall: <br /> A. Indicate the progress of each activity to the date of submission. <br /> B. Show changes occurring since the previous submission listing: <br /> 1. Major changes in scope. <br /> 2. Activities modified since the previous submission. <br /> 3. Revised projections of progress and completion. <br /> 4. Other identifiable changes. <br /> C. Provide a narrative report as needed to define: <br /> 1. Problem areas, anticipated delays, and the impact on the schedule. <br /> 2. Corrective action recommended and its effect. <br /> 3. The effect of changes on schedules of other prime contractors. <br /> 1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br /> On or before the tenth day after the effective date of the Agreement, submit the <br /> initial schedules to the ENGINEER. The ENGINEER will review the schedules and <br /> return a review copy to the CONTRACTOR within 21 days after receipt. If required <br /> by the ENGINEER, resubmit revised schedules on or before the seventh day after <br /> receipt of the review copy. If required by the ENGINEER, submit revised monthly <br /> progress schedules with that month's application for payment. <br /> 01310-1 01310 Construction Schedule <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid DocumentsWlaster <br /> Contract DocumentsWlaster Contract Documents\01310-Construction Schedule.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.