SECTION 01340 <br /> SUBMITTAL OF SHOP DRAWINGS <br /> E. All submittals shall bear the stamp of approval and signature of <br /> CONTRACTOR as evidence that they have been reviewed by <br /> CONTRACTOR. Submittals without this stamp of approval will not be <br /> reviewed by the ENGINEER and will be returned to CONTRACTOR. <br /> F. Assign a number to each submittal starting with No. 1 and thence <br /> numbered consecutively. Identify resubmittals by the original submittal <br /> number followed by the suffix "A" for the first resubmittal, the suffix "B" for <br /> the second resubmittal, etc. <br /> G. Initially submit to ENGINEER a minimum of two (2) copies of all submittals <br /> that are on 11-inch by 17-inch or smaller sheets (no less than 8 1/2-inch x <br /> 11-inch). <br /> H. After ENGINEER completes his review, Shop Drawings will be marked <br /> with one of the following notations: <br /> 1. Approved <br /> 2. Approved as Noted <br /> 3. NOT Approved - Resubmit <br /> I. If a submittal is acceptable, it will be marked "Approved" or "Approved as <br /> Noted". One (1) electronic copy of the submittal will be returned to <br /> CONTRACTOR. <br /> J. Upon return of a submittal marked "Approved" or "Approved as Noted", <br /> CONTRACTOR may order, ship or fabricate the materials included on the <br /> submittal, provided it is in accordance with the corrections indicated. <br /> K. If a submittal is unacceptable, one (1) copy will be returned to <br /> CONTRACTOR with following notation, "NOT Approved - Resubmit". <br /> L. Upon return of a submittal marked "NOT Approved - Resubmit", make the <br /> corrections indicated and repeat the initial approval procedure. Upon <br /> return of a submittal so marked, repeat the initial approval procedure <br /> utilizing acceptable material or equipment. <br /> M. Work shall not be performed nor equipment installed with an ENGINEER <br /> "Approved" or"Approved as Noted" Shop Drawing. <br /> N. Submit Shop Drawings well in advance of the need for the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> approved. CONTRACTOR shall assume the risk for all materials or <br /> 01340-Submittal of Shop Drawings <br /> 01340-5 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents'Master Contract Documents\01340-Submittal of Shop Drawings.doc <br />