Laserfiche WebLink
SECTION 01340 <br /> SUBMITTAL OF SHOP DRAWINGS <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings. Materials or equipment requiring Shop Drawings which have <br /> not yet received approval by the ENGINEER shall not be installed on the <br /> project. Materials or equipment will not be included in periodic progress <br /> payments until approval thereof has been obtained in the specified <br /> manner. <br /> P. ENGINEER will review and process all submittals promptly, but a <br /> reasonable time should be allowed for this, for the Shop Drawings being <br /> revised and resubmitted, and for time required to return the approved <br /> Shop Drawings to CONTRACTOR. <br /> Q. Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals. All <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings, Samples or other items requiring approval, will be back-charged <br /> to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions. If the CONTRACTOR requests a substitution <br /> for a previously approved item, all of ENGINEER'S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR. <br /> + + END OF SECTION + + <br /> 01340-Submittal of Shop Drawings <br /> 01340-6 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01340-Submittal of Shop Drawings.doc <br />