My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br /> SUBMITTAL OF SHOP DRAWINGS <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings. Materials or equipment requiring Shop Drawings which have <br /> not yet received approval by the ENGINEER shall not be installed on the <br /> project. Materials or equipment will not be included in periodic progress <br /> payments until approval thereof has been obtained in the specified <br /> manner. <br /> P. ENGINEER will review and process all submittals promptly, but a <br /> reasonable time should be allowed for this, for the Shop Drawings being <br /> revised and resubmitted, and for time required to return the approved <br /> Shop Drawings to CONTRACTOR. <br /> Q. Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals. All <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings, Samples or other items requiring approval, will be back-charged <br /> to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions. If the CONTRACTOR requests a substitution <br /> for a previously approved item, all of ENGINEER'S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR. <br /> + + END OF SECTION + + <br /> 01340-Submittal of Shop Drawings <br /> 01340-6 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01340-Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.