Laserfiche WebLink
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> 1.1 SCOPE <br /> A. Provide all construction equipment and facilities and temporary controls <br /> required to satisfactorily complete the work represented on the Drawings and <br /> described in the Specifications. <br /> 1.2 RESPONSIBILITY <br /> A. All construction facilities and temporary controls remain the property of the <br /> Contractor establishing them and shall be maintained in a safe and useful <br /> condition until removed from the construction site. <br /> B. All false work, scaffolding, ladders, hoistways, braces, pumps, roadways, <br /> sheeting, forms, barricades, drains, flumes, and the like, any of which may <br /> be needed in construction of any part of the work and which are not herein <br /> described or specified in detail, must be furnished, maintained and removed <br /> by the CONTRACTOR, who is responsible for the safety and efficiency of <br /> such work and for any damage that may result from their failure or from their <br /> improper construction, maintenance or operation. <br /> C. In accepting the Contract,the CONTRACTOR assumes full responsibility for <br /> the sufficiency and safety of all hoists, cranes, temporary structures or work <br /> and for any damage which may result from their failure or their improper <br /> construction, maintenance or operation and will indemnify and save harmless <br /> the OWNER and ENGINEER from all claims, suits or actions and damages <br /> or costs of every description arising by reason of failure to comply with the <br /> above provision. <br /> 1.3 TEMPORARY UTILITIES AND SERVICES <br /> A. TEMPORARY WATER <br /> 1. Provide a temporary water service as required for all construction <br /> purposes and pay for all water used. <br /> 2. Furnish potable drinking water in suitable dispensers and with cups <br /> for use of all employees at the job. <br /> 3. Provide all temporary piping, hoses, etc., required to transport water <br /> to the point of usage by all trades. <br /> 4. When temporary water service is no longer required, remove all <br /> temporary water lines. <br /> 01520-1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br /> Contract Documents\Master Contract Documents\01520-Construction Facilities.doc <br />