My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> B. TEMPORARY SANITARY FACILITIES <br /> 1. Provide temporary toilet facilities separate from the job office. <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job. Provide <br /> enough chemical toilets to conveniently serve the needs of all <br /> personnel. Properly seclude toilet facilities from public observation. <br /> 2. Chemical toilets and their maintenance shall meet the requirements of <br /> State and local health regulations and ordinances. Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements. Upon completion of work, remove the facilities from the <br /> premises. <br /> 1.4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract, but the <br /> CONTRACTOR shall provide inspection of work area daily and shall take whatever <br /> measures are necessary to protect the safety of the public,workmen, and materials, <br /> and provide for the security of the site, both day and night. <br /> 1.5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work of <br /> this Contract. In dry weather, spray dusty areas daily with water in order to control <br /> dust. Take necessary steps to prevent the tracking of mud onto adjacent streets <br /> and highways. <br /> 1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities, services, and controls and legally dispose <br /> of them as soon as the work is for complete. The areas of the site used temporary <br /> p eto po ary <br /> facilities shall be properly reconditioned and restored to a condition acceptable to <br /> the OWNER. <br /> + + END OF SECTION + + <br /> 01520-2 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents Master <br /> Contract Documents\Master Contract Documents\01520-Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.