My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1.3 TREE AND PLANT PROTECTION <br /> A. Protect existing trees, shrubs and plants on or adjacent to the site that are shown or <br /> designated to remain in place against unnecessary cutting, breaking or skinning of <br /> trunk, branches, bark or roots. <br /> B. Do not store or park materials or equipment within the drip line of trees that are to <br /> remain. <br /> C. Install temporary fences or barricades to protect trees and plants in areas subject to <br /> traffic. <br /> D. Fires shall not be permitted under or adjacent to trees and plants. <br /> E. Within the limits of the Work, water trees and plants that are to remain, in order to <br /> maintain their health during construction operations. <br /> F. Cover all exposed roots with burlap and keep it continuously wet. Cover all <br /> exposed roots with earth as soon as possible. Protect root systems from <br /> mechanical damage and damage by erosion, flooding, run-off or noxious materials <br /> in solution. <br /> G. If branches or trunks are damaged, prune branches immediately and protect the cut <br /> or damaged areas with emulsified asphalt compounded specifically for horticultural <br /> use. <br /> H. Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality. <br /> I. Coordinate Work in this Section with requirements of other sections herein. <br /> 1.4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements, which could be damaged by construction <br /> activities. The CONTRACTOR shall repair any irrigation systems damaged by <br /> construction activities within two (2) days. Irrigation systems partially within the <br /> right-of-way of 58th Avenue and all intersecting side streets within project limits may <br /> be cut off and capped or connected to same system to maintain functionality. The <br /> CONTRACTOR shall be responsible for maintaining the functionality of the <br /> remaining portion of the system if it should fall outside of the right-of-way. <br /> 01541-2 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br /> Contract Documents\Master Contract Documents\01541-Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.