My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1.1 GENERAL <br /> A. Make all arrangements for transportation, delivery and handling of equipment and <br /> materials required for prosecution and completion of the Work. <br /> B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered to <br /> the site only during regular working hours. Shipments shall be addressed and <br /> consigned to the proper party giving name of Project, street number and city. <br /> Shipments shall not be delivered to OWNER except where otherwise directed. <br /> C. If necessary to move stored materials and equipment during construction, <br /> CONTRACTOR shall move or cause to be moved materials and equipment <br /> without any additional compensation. <br /> 1.2 DELIVERY <br /> A. Arrange deliveries of products in accord with construction schedules and in ample <br /> time to facilitate inspection prior to installation. <br /> B. Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following: <br /> 1. Work of other contractors, or OWNER. <br /> 2. Limitations of storage space. <br /> 3. Availability of equipment and personnel for handling products. <br /> 4. OWNER'S use of premises. <br /> C. Do not have products delivered to project site until related Shop Drawings have <br /> been approved by the ENGINEER. <br /> D. Do not have products delivered to site until required storage facilities have been <br /> provided. <br /> E. Have products delivered to site in manufacturer's original, unopened, labeled <br /> containers. Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work. <br /> F. Partial deliveries of component parts of equipment shall be clearly marked to <br /> identify the equipment, to permit easy accumulation of parts, and to facilitate <br /> assembly. <br /> 01610-1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br /> Contract Documents\Master Contract Documents\01610-Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.