My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-_ SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> G. Immediately on delivery, Contractor shall inspect shipment to assure: <br /> 1. Product complies with requirements of Contract Documents and reviewed <br /> submittals. <br /> 2. Quantities are correct. <br /> 3. Containers and packages are intact, labels are legible. <br /> 4. Products are properly protected and undamaged. <br /> 1.3 PRODUCT HANDLING <br /> A. Provide equipment and personnel necessary to handle products, including those <br /> provided by OWNER, by methods to prevent soiling or damage to products or <br /> packaging. <br /> B. Provide additional protection during handling as necessary to prevent scraping, <br /> marring or otherwise damaging products or surrounding surfaces. <br /> C. Handle products by methods to prevent bending or overstressing. <br /> D. Lift heavy components only at designated lifting points. <br /> E. Materials and equipment shall at all times be handled in a safe manner and as <br /> recommended by manufacturer or supplier so that no damage will occur to them. <br /> Do not drop, roll or skid products off delivery vehicles. Hand carry or use suitable <br /> materials handling equipment. <br /> + + END OF SECTION + + <br /> 01610-2 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br /> Contract DocumentsWaster Contract Documents\01610-Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.