My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> G. It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed, <br /> destroyed, or damaged during construction. Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction. <br /> H. When finished surfaces require cleaning with cleaning materials, use only <br /> those cleaning materials which will not create hazards to health or property <br /> and which will not damage the surfaces. Use cleaning materials only on <br /> those surfaces recommended by the manufacturer. Follow the <br /> manufacturer's directions and recommendations at all times. <br /> I. Keep the amount of dust produced during construction activities to a <br /> minimum. At CONTRACTOR's expense, spray water or other dust control <br /> agents over the areas, which are producing the dust. Schedule construction <br /> operations so that dust and other contaminants will not fall on wet or newly <br /> coated surfaces. <br /> 1.3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion,the OWNER, ENGINEER and CONTRACTOR shall review <br /> the site with regards to site cleanup and restoration. Clean and/or restore all items <br /> determined to be unsatisfactory by the OWNER or ENGINEER, at no additional <br /> expense. <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01710-Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.