My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01770 <br /> CLOSEOUT PROCEDURES <br /> PART 1 - GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and other Division 1 Specification Sections, apply to <br /> this Section. <br /> 1.2 SUMMARY <br /> A. This Section includes administrative and procedural requirements for contract <br /> closeout, including, but not limited to, the following: <br /> 1. Inspection procedures <br /> 2. Warranties <br /> 3. Final cleaning <br /> B. Related Sections include the following: <br /> 1. Division 1 Section "Payment Procedures"for requirements for Applications <br /> for Payment for Substantial and Final Completion. <br /> 2. Divisions 2 through 16 Sections for specific closeout and special cleaning <br /> requirements for the Work in those Sections. <br /> 1.3 SUBSTANTIAL COMPLETION <br /> A. Preliminary Procedures: Before requesting inspection for determining date of <br /> Substantial Completion, complete the following. List items below that are <br /> incomplete in request. <br /> 1. Prepare a list of items to be completed and corrected (punch list), the value <br /> of items on the list, and reasons why the Work is not complete. <br /> 2. Advise Owner of pending insurance changeover requirements. <br /> 3. Advise Owner of changeover in heat and other utilities. <br /> 4. Submit changeover information related to Owner's occupancy, use, <br /> operation, and maintenance. <br /> 5. Complete final cleaning requirements, including touchup painting. <br /> 6. Touch up and otherwise repair and restore marred exposed finishes to <br /> eliminate visual defects. <br /> 01770 Closeout Procedures <br /> 01770-1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01770-Closeout Procedures.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.