Laserfiche WebLink
SECTION 01770 <br /> CLOSEOUT PROCEDURES <br /> PART 1 - GENERAL <br /> 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and other Division 1 Specification Sections, apply to <br /> this Section. <br /> 1.2 SUMMARY <br /> A. This Section includes administrative and procedural requirements for contract <br /> closeout, including, but not limited to, the following: <br /> 1. Inspection procedures <br /> 2. Warranties <br /> 3. Final cleaning <br /> B. Related Sections include the following: <br /> 1. Division 1 Section "Payment Procedures"for requirements for Applications <br /> for Payment for Substantial and Final Completion. <br /> 2. Divisions 2 through 16 Sections for specific closeout and special cleaning <br /> requirements for the Work in those Sections. <br /> 1.3 SUBSTANTIAL COMPLETION <br /> A. Preliminary Procedures: Before requesting inspection for determining date of <br /> Substantial Completion, complete the following. List items below that are <br /> incomplete in request. <br /> 1. Prepare a list of items to be completed and corrected (punch list), the value <br /> of items on the list, and reasons why the Work is not complete. <br /> 2. Advise Owner of pending insurance changeover requirements. <br /> 3. Advise Owner of changeover in heat and other utilities. <br /> 4. Submit changeover information related to Owner's occupancy, use, <br /> operation, and maintenance. <br /> 5. Complete final cleaning requirements, including touchup painting. <br /> 6. Touch up and otherwise repair and restore marred exposed finishes to <br /> eliminate visual defects. <br /> 01770 Closeout Procedures <br /> 01770-1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01770-Closeout Procedures.doc <br />