Laserfiche WebLink
SECTION 01770 <br /> CLOSEOUT PROCEDURES <br /> 1. Organize list of spaces in sequential order, starting with exterior areas first <br /> and proceeding from lowest floor to highest floor. <br /> 2. Organize items applying to each space by major element, including <br /> categories for ceiling, individual walls, floors, equipment, and building <br /> systems. <br /> 3. Include the following information at the top of each page: <br /> a. Project name <br /> b. Date <br /> c. Name of Architect <br /> d. Name of Contractor <br /> e. Page number <br /> 1.6 WARRANTIES <br /> A. Submittal Time: Submit written warranties on request of Architect for designated <br /> portions of the Work where commencement of warranties other than date of <br /> Substantial Completion is indicated. <br /> B. Partial Occupancy: Submit properly executed warranties within 15 days of <br /> completion of designated portions of the Work that are completed and occupied or <br /> used by Owner during construction period by separate agreement with Contractor. <br /> C. Organize warranty documents into an orderly sequence based on the table of <br /> contents of the Project Manual. <br /> 1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf <br /> binders, thickness as necessary to accommodate contents, and sized to <br /> receive 8-112-by-11-inch (215-by-280-mm) paper. <br /> 2. Provide heavy paper dividers with plastic-covered tabs for each separate <br /> warranty. Mark tab to identify the product or installation. Provide a typed <br /> description of the product or installation, including the name of the product <br /> and the name, address, and telephone number of Installer. <br /> 3. Identify each binder on the front and spine with the typed or printed title <br /> "WARRANTIES," Project name, and name of Contractor. <br /> D. Provide additional copies of each warranty to include in operation and <br /> maintenance manuals. <br /> PART 2 - PRODUCTS <br /> 2.1 MATERIALS <br /> A. Cleaning Agents: Use cleaning materials and agents recommended by <br /> manufacturer or fabricator of the surface to be cleaned. Do not use cleaning <br /> 01770 Closeout Procedures <br /> 01770-3 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Rep lacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01770-Closeout Procedures.doc <br />