Laserfiche WebLink
B. Use of Existing Building <br /> 1. Maintain existing building in a weathertight condition throughout construction <br /> period. <br /> 2. Take every precaution against injuries to persons or damage to property. <br /> 3. Protect building, its contents,and its occupants during construction period. <br /> 4. The Contractor shall not overload or permit any part of the structure to be loaded <br /> with such weights as will endanger its safety or to cause excessive deflection. <br /> Materials placed on the roof prior to installation shall be equally distributed over <br /> the roof area. <br /> 5. Protect any existing surface improvements, such as pavements, curbs, sidewalks, <br /> lawn and landscaped areas,utilities,etc. <br /> 6. Repair to the Owner and Engineer's satisfaction, or to restore to a condition equal <br /> to that existing at the time of award of Contract,or to make restitution acceptable to <br /> the Owner, any and all damages to the building, its contents, or surface <br /> improvements resulting from,or attributable to,the work operation. <br /> C. Transportation Facilities <br /> 1. Truck and equipment access: <br /> a. Avoid traffic conflict with vehicles of the Owner's employees and <br /> customers, and avoid over-loading of street and driveways elsewhere on <br /> the Owner's property, limit the access of trucks and equipment to the <br /> designated areas. <br /> b. Provide adequate protection for curbs and sidewalks over which trucks and <br /> equipment pass to reach the job site. <br /> 2. Contractor's vehicles: <br /> a. Require contractor's vehicles, vehicles belonging to employees of the <br /> contractor, and all other vehicles entering the Owner's property in <br /> performance of the work the contract, to use only the designated access <br /> route. <br /> b. Do not permit such vehicles to park on any street or other area of the <br /> Owner's property except in the designated area. <br /> 1.05 OWNER POLICIES <br /> A. Conduct Policy <br /> 1. The conduct of all contractor employees during any project shall be exemplary; <br /> at no time shall profanity, drinking, lewd or suggestive comments or gestures or <br /> other acts of this nature be tolerated. <br /> B. Drug Free Policy <br /> 1. Owner conforms to a drug free policy. Any contractor employee must be tested <br /> upon request of Owner and results provided to Owner. If the employee is found <br /> to have been under the influence or using drugs, it shall constitute a breach of <br /> contract and said contract may be terminated without penalty to the Owner. <br /> C. Dress Code Policy <br /> 1. Shirts and shoes are required at all times, as well as long pants. Identification of <br /> employees is required. <br /> Sebastian Corners Roof Replacement 01 14 00-2 Work Restrictions <br />