Laserfiche WebLink
SECTION 0125 00 <br /> PRODUCT SUBSTITUTIONS <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This Section specifies administrative and procedural requirements for handling requests <br /> for substitutions prior to the Owner's receipt of bids. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> 1.03 DEFINITIONS <br /> A. Definitions used in this Article are not intended to change or modify the meaning of other <br /> terms used in the Contract Documents. <br /> B. Substitutions: Requests for changes in products, materials, and equipment, of <br /> construction required by Contract Documents proposed by the Contractor are considered <br /> requests for"substitutions". The following are not considered substitutions: <br /> 1. Substitutions that are requested by Bidders beyond the 14 days prior to bid <br /> opening submittal period. <br /> 2. Revisions to Contract Documents requested by the Owner or Engineer. <br /> 3. Specified options of products and construction methods included in Contract <br /> Documents. <br /> 4. The Contractor's determination of and compliance with governing regulations <br /> and orders issued by governing authorities. <br /> 1.04 SUBMITTALS—PRIOR TO BID <br /> A. Substitution Request Submittal: Written requests for substitution from prime bidders will <br /> be considered if received by the Engineer fourteen (14) calendar days prior to the bid <br /> opening. <br /> 1. Submit each request for substitution to purchasing@ircgov.com on the form <br /> contained in Section 00 63 25-Substitution Request Form for consideration in <br /> accordance with procedures required below. <br /> 2. <br /> Identify the product or the fabrication or installation method to be replaced in <br /> each request. Include related specification sections and drawing number. <br /> 3. Provide complete documentation on both the product specified and the proposed <br /> substitution including the following information as appropriate. <br /> a. Comparison of specified and proposed substitute product data, <br /> fabrication drawings,and installation procedures. <br /> b. Samples where applicable or requested. <br /> c. A detailed comparison of significant qualities of the proposed <br /> substitution with those of the work specified. <br /> Sebastian Corners Roof Replacement 01 25 00-1 Product Substitutions <br />