My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0125 00 <br /> PRODUCT SUBSTITUTIONS <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. This Section specifies administrative and procedural requirements for handling requests <br /> for substitutions prior to the Owner's receipt of bids. <br /> 1.02 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Specification Sections,apply to this Section. <br /> 1.03 DEFINITIONS <br /> A. Definitions used in this Article are not intended to change or modify the meaning of other <br /> terms used in the Contract Documents. <br /> B. Substitutions: Requests for changes in products, materials, and equipment, of <br /> construction required by Contract Documents proposed by the Contractor are considered <br /> requests for"substitutions". The following are not considered substitutions: <br /> 1. Substitutions that are requested by Bidders beyond the 14 days prior to bid <br /> opening submittal period. <br /> 2. Revisions to Contract Documents requested by the Owner or Engineer. <br /> 3. Specified options of products and construction methods included in Contract <br /> Documents. <br /> 4. The Contractor's determination of and compliance with governing regulations <br /> and orders issued by governing authorities. <br /> 1.04 SUBMITTALS—PRIOR TO BID <br /> A. Substitution Request Submittal: Written requests for substitution from prime bidders will <br /> be considered if received by the Engineer fourteen (14) calendar days prior to the bid <br /> opening. <br /> 1. Submit each request for substitution to purchasing@ircgov.com on the form <br /> contained in Section 00 63 25-Substitution Request Form for consideration in <br /> accordance with procedures required below. <br /> 2. <br /> Identify the product or the fabrication or installation method to be replaced in <br /> each request. Include related specification sections and drawing number. <br /> 3. Provide complete documentation on both the product specified and the proposed <br /> substitution including the following information as appropriate. <br /> a. Comparison of specified and proposed substitute product data, <br /> fabrication drawings,and installation procedures. <br /> b. Samples where applicable or requested. <br /> c. A detailed comparison of significant qualities of the proposed <br /> substitution with those of the work specified. <br /> Sebastian Corners Roof Replacement 01 25 00-1 Product Substitutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.