My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
replacement of unacceptable work or personnel at any time. <br /> B. All contractors shall cooperate in the execution of their work and shall plan their work in <br /> such manners as to avoid conflicting schedules or delay of work. If any part of a Contrac- <br /> tor's work depends upon the work of another Contractor, defects, which may affect that <br /> work, shall be reported to the Engineer in order that prompt inspection may be made and <br /> defects corrected. Commencement of work by a Contractor where such condition exists <br /> will constitute acceptance of the other Contractor's work as being satisfactory in all respects <br /> to receive the work commenced, except defects, which may later develop. Work of all <br /> trades under this contract shall be closely coordinated in such a manner as to obtain the <br /> best possible workmanship for the entire project. All components of the work shall be <br /> installed in accordance with the best practices of the particular trade. The General Con- <br /> tractor is responsible to advise the Owner sufficiently in advance of operations to allow for. <br /> assignment of personnel. <br /> C. Materials or methods described by words which, when applied, have a well known tech- <br /> nical or trade meaning will be held to refer to such recognized standard. Standard specifi- <br /> cations or manufacturer's literature,when referenced,shall be of the latest revision or print- <br /> ing unless otherwise stated, and are intended to establish the minimum requirements ac- <br /> ceptable. <br /> D. All materials shall be new, all materials and workmanship shall be in every respect in ac- <br /> cordance with the best modern practice. <br /> E. When special makes or grades of material which are normally packaged by the supplier or <br /> manufacturer are specified or accepted,such materials shall be delivered to the site in orig- <br /> inal packages or containers with seals unbroken and labels intact and shall not be opened <br /> until inspected and approved by the Engineer. Contractor shall notify the Engineer prior <br /> to such material's delivery. <br /> F. The Contractor's Foreman or Superintendent to maintain one complete set of the contract <br /> documents and approved submittals on the job site. <br /> G. Contractor shall be responsible to correct deficiencies identified by Engineer and non-con- <br /> forming work within 24 hours of receipt of notification, either verbally or written, and <br /> submit a plan of action for addressing the deficiencies and non-conforming work. Further <br /> tear-off or commencement of other work shall not occur until all deficiencies and non- <br /> conforming work are properly addressed. <br /> H. Installer Qualifications: A firm or individual experienced in installing,erecting,or assem- <br /> bling work similar in material, design, and extent to that indicated for this Project, whose <br /> work has resulted in construction with a record of successful in-service performance. <br /> 1. Acceptable Contractor: <br /> a. Be certified in writing for a minimum of two years by the roofing materials <br /> manufacturer to install the primary roofing products. <br /> b. Have a minimum of five (5) years experience in installing the same or <br /> similar materials specified under the same firm name as that submitting <br /> the bid. If requested,submit a copy of firm's Articles of Incorporation to <br /> verify years in business. Also all crew workers on site are to be experi- <br /> enced and have a working knowledge of the system being installed. <br /> c. Principals of the firm to have a minimum of ten(10)years experience in <br /> the estimating, supervision, management and administration of a <br /> Sebastian Corners Roof Replacement 01 40 00-2 Quality Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.