Laserfiche WebLink
Provide the following: <br /> 1. Access to the Work. <br /> 2. Incidental labor and facilities necessary to facilitate tests and inspections. <br /> 3. Adequate quantities of representative samples of materials that require testing and <br /> inspecting. Assist agency in obtaining samples. <br /> 4. Facilities for storage and field-curing of test samples. <br /> 5. Preliminary design mix proposed for use for material mixes that require control by <br /> testing agency. <br /> 6. Security and protection for samples and for testing and inspecting equipment at <br /> Project site. <br /> PART 2 PRODUCTSED N T <br /> ( O USED) <br /> PART 3 EXECUTION <br /> 3.01 REPAIR AND PROTECTION <br /> A. General:a. On completion of testing, inspecting,sample taking,and similar services,repair <br /> damaged construction and restore substrates and finishes. <br /> 1. Comply with the Contract Document requirements for Section 01 73 29-Cutting <br /> and Patching. <br /> B. Protect construction exposed byor for quality-control service activities. <br /> P q h' <br /> C. Repair and protection are Contractor's responsibility, regardless of the assignment of re- <br /> sponsibility for quality-control services. <br /> END OF SECTION 0140 00 <br /> Sebastian Corners Roof Replacement 0140 00-6 Quality Requirements <br />