not be readily identified and recorded later. <br /> b. Record data as soon as possible after obtaining it. Record and check the <br /> markup before enclosing concealed installations. <br /> 2. Mark record sets with erasable, red-colored pencil. Use other colors to distin- <br /> guish between changes for different categories of the Work at the same location. <br /> 3. Note Construction Change Directive numbers, Change Order numbers, alternate <br /> numbers,and similar identification where applicable. <br /> 4. Identify and date each Record Drawing; include the designation "PROJECT <br /> RECORD DRAWING" in a prominent location. Organize into manageable sets; <br /> bind each set with durable paper cover sheets. Include identification on cover <br /> sheets. <br /> C. Record Specifications: Submit one copy of Project's Specifications, including addenda <br /> and contract modifications. Mark copy to indicate the actual product installation where <br /> installation varies from that indicated in Specifications, addenda, and contract modifica- <br /> tions. <br /> 1. Give particular attention to information on concealed products and installations <br /> that cannot be readily identified and recorded later. <br /> 2. Mark copy with the proprietary name and model number of products, materials, <br /> and equipment furnished,including substitutions and product options selected. <br /> 3. Note related Change Orders and Record Drawings,where applicable. <br /> D. Miscellaneous Record Submittals: Assemble miscellaneous records required by other <br /> Specification Sections for miscellaneous record keeping and submittal in connection with <br /> actual performance of the Work. Bind or file miscellaneous records and identify each, <br /> ready for continued use and reference. The following items shall be submitted, not lim- <br /> ited to: <br /> 1. Completed and signed Engineer's Punch List <br /> 2. Copy of Manufacturer's Final Inspection Report <br /> 3. Fastener Pull Tests <br /> 4. Landfill Charge Tickets <br /> 5. Asbestos Disposal Manifests(If Applicable) <br /> 6. Certificate of Occupancy(If Applicable) <br /> 1.06 WARRANTIES <br /> A. Thermoplastic Single Ply Roofing System warranty as outlined in Section 07 54 00. <br /> B. Pre-finished Sheet Metal finish warranty as outlined in Section 07 62 00. <br /> C. Contractor's five (5) year warranty on their company letterhead using sample contained <br /> in the Project Manual. <br /> 1. Contractor will be required to attend two post construction field inspections: the <br /> first no earlier than twenty -three (23)months and no later than twenty-four(24) <br /> months after the date of Final Completion and the second no earlier than fifty- <br /> nine (59) months and no later than sixty(60) months. Contractor shall complete <br /> any corrective action requested by Owner,Engineer, or Manufacturer at no addi- <br /> tional cost to the Owner. <br /> D. Contractor's Asbestos-Free Warranty on their company letterhead using sample con- <br /> • <br /> Sebastian Corners Roof Replacement 01 77 00-3 Closeout Procedures <br />