My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not be readily identified and recorded later. <br /> b. Record data as soon as possible after obtaining it. Record and check the <br /> markup before enclosing concealed installations. <br /> 2. Mark record sets with erasable, red-colored pencil. Use other colors to distin- <br /> guish between changes for different categories of the Work at the same location. <br /> 3. Note Construction Change Directive numbers, Change Order numbers, alternate <br /> numbers,and similar identification where applicable. <br /> 4. Identify and date each Record Drawing; include the designation "PROJECT <br /> RECORD DRAWING" in a prominent location. Organize into manageable sets; <br /> bind each set with durable paper cover sheets. Include identification on cover <br /> sheets. <br /> C. Record Specifications: Submit one copy of Project's Specifications, including addenda <br /> and contract modifications. Mark copy to indicate the actual product installation where <br /> installation varies from that indicated in Specifications, addenda, and contract modifica- <br /> tions. <br /> 1. Give particular attention to information on concealed products and installations <br /> that cannot be readily identified and recorded later. <br /> 2. Mark copy with the proprietary name and model number of products, materials, <br /> and equipment furnished,including substitutions and product options selected. <br /> 3. Note related Change Orders and Record Drawings,where applicable. <br /> D. Miscellaneous Record Submittals: Assemble miscellaneous records required by other <br /> Specification Sections for miscellaneous record keeping and submittal in connection with <br /> actual performance of the Work. Bind or file miscellaneous records and identify each, <br /> ready for continued use and reference. The following items shall be submitted, not lim- <br /> ited to: <br /> 1. Completed and signed Engineer's Punch List <br /> 2. Copy of Manufacturer's Final Inspection Report <br /> 3. Fastener Pull Tests <br /> 4. Landfill Charge Tickets <br /> 5. Asbestos Disposal Manifests(If Applicable) <br /> 6. Certificate of Occupancy(If Applicable) <br /> 1.06 WARRANTIES <br /> A. Thermoplastic Single Ply Roofing System warranty as outlined in Section 07 54 00. <br /> B. Pre-finished Sheet Metal finish warranty as outlined in Section 07 62 00. <br /> C. Contractor's five (5) year warranty on their company letterhead using sample contained <br /> in the Project Manual. <br /> 1. Contractor will be required to attend two post construction field inspections: the <br /> first no earlier than twenty -three (23)months and no later than twenty-four(24) <br /> months after the date of Final Completion and the second no earlier than fifty- <br /> nine (59) months and no later than sixty(60) months. Contractor shall complete <br /> any corrective action requested by Owner,Engineer, or Manufacturer at no addi- <br /> tional cost to the Owner. <br /> D. Contractor's Asbestos-Free Warranty on their company letterhead using sample con- <br /> • <br /> Sebastian Corners Roof Replacement 01 77 00-3 Closeout Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.