Laserfiche WebLink
F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the <br />Contract Documents, and all additional examinations, investigations, explorations, tests, <br />studies, and data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the-Contract/Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficienfto indicate and convey understanding of <br />all terms and conditions for performan e.and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consistlof the following;'-'� <br />1. This Agreement (pages 00520-1. to 00520-.10, inclusive); <br />2. Notice to Proceed \(page -00550=1);� <br />3. Public Co struction Bond (pages 00610`-;1 to 00610-3, inclusive); <br />4. Sample Certificate ofL-iability,lnsurance (page 00620-1); <br />5i.,` Contractors 'Applica/ion for_Payment (pages 00622-1 to 00622-6 inclusive); <br />`6. `Certificate -of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor sYFinal'Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the <br />Work (page -00634-1): <br />9. General Conditions (pages 00700-1 to 00700-45, inclusive); <br />10. Supplementary Conditions (pages 00800-i to 00800-11, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical <br />Provisions); <br />12. Drawings consisting of a cover sheet and sheets numbered 1 through 54, inclusive, <br />with each sheet bearing the following general title: CR 512 RESURFACING & <br />SHOULDER WIDENING and drawings consisting of a cover sheet and sheets <br />@BCL@343F377F.93 <br />00520-6 <br />C:\Users\legistar\HppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@343F377F\@BCL@343F377F.doc <br />