CONTRACTOR for all things done or furnished in connection with the work under
<br />this Contract and for every act and neglect of the OWNER and others relating to or
<br />arising out of the work. Any payment, however, final or otherwise, shall not release
<br />the CONTRACTOR or its sureties from any obligations under the Contract
<br />Documents or the Public Construction Bond.
<br />ARTICLE 7 - INDEMNIFICATION
<br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with
<br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract.
<br />1
<br />7.02 To the fullest extent permitted by law, the Recipient's contractor/consultant shall indemnify
<br />and hold harmless the Recipient and the State of Florida, 'Department of Transportation,
<br />including the Department's officers and employees, from liabilities, damages, losses and
<br />costs, including, but not limited to, reasonable attorney's from, liabilities,
<br />the extent caused by the
<br />negligence, recklessness or intentional wrongful misconduct of the contractor or
<br />consultant and persons employed or utilized, by the contractoe\or consultant in the
<br />performance of this Agreement. 'X
<br />ARTICLE 8 - CONTRACTOR'S REPRESENT TIONS \
<br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br />following representations:
<br />A. CONTRACTOR has examined ``and carefully `studied the Contract Documents and the
<br />other related data identified in the'Bidding\Docurrienfs:,
<br />B. CONTRACTOR has�visited`the Site\and become familiar with and is satisfied as to the
<br />general, local, and Site conditions -that, may affect*cost, progress, and performance of the
<br />Work.
<br />C. CONTRACTOR -is familiar with,and is satisfied as to all federal, state, and local Laws and
<br />Regulations
<br />gltions i:hat,`may affect cost; progress, and performance of the Work.
<br />D.:' CONTRACTOR\h s arefully, studied all: (1) reports of explorations and tests of
<br />subsurface conditions -at or contiguous to the Site and all drawings of physical conditions
<br />in\or--relating-to existing surface or subsurface structures at or contiguous to the Site
<br />(except—Underground Facilities) which have been identified in the Supplementary
<br />Conditions as provided -in paragraph 4.02 of the General Conditions and (2) reports and
<br />drawings of a Hazardous Environmental Condition, if any, at the Site which have been
<br />identified in -the -Supplementary Conditions as provided in paragraph 4.06 of the General
<br />Conditions.
<br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br />done so) all additional or supplementary examinations, investigations, explorations, tests,
<br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
<br />at or contiguous to the Site which may affect cost, progress, or performance of the Work
<br />or which relate to any aspect of the means, methods, techniques, sequences, and
<br />procedures of construction to be employed by CONTRACTOR, including applying the
<br />specific means, methods, techniques, sequences, and procedures of construction, if any,
<br />expressly required by the Contract Documents to be employed by CONTRACTOR, and
<br />safety precautions and programs incident thereto