Laserfiche WebLink
CR 512 RESURFACING - FROM MYRTLE ST. TO 12571 AvE. Page -3- <br />IRC PRojEcr No. 1305 <br />AACE Proposal No. P18-1117 <br />Proposed Testing Frequency <br />The following in-place density testing frequencies are typically employed by AACE for similar roadway projects: <br />Roadways and Turnouts: <br />Natural Ground - 1 test performed 1 foot into natural ground per 100 lineal feet, per travel direction <br />Embankment - 1 test per 100 lineal feet, per travel direction, per 12 -inch lift <br />Stabilized Subgrade - 1 test per 200 lineal feet, per travel direction, per 12 -inch lift <br />Base Course - 1 test per 100 lineal feet, per travel direction, per 6 -inch lift <br />Sidewalks - 1 test per 100 lineal feet, per 12 -inch lift of embankment or 1 foot into natural ground <br />Curb Pad Subgrade -1 test per 100 lineal feet <br />Drainage: <br />Structures -1 test per 12 -inch lift of backfill, from bottom of structure to top of structure. (Fill placed on all sides <br />of structure is probed with a manual probe rod to confirm uniform compactive effort). <br />Piping - 1 test per 200 lineal feet (or per backfill/open cut operation) per 12 -inch lift along both sides of pipe <br />to top -of -pipe, then every 1 foot of fill atop pipe thereafter. <br />Concrete Testing_ <br />A minimum of one set of four (4) cylinders will be made for every pour, and for each 50 cubic yards for larger <br />pours. <br />One slump test will be performed for every pour, and for each 50 cubic yards for larger pours. <br />Proposed Scope and Budget <br />Man -Hour Estimates: <br />Construction will have an approximate duration of approximately 5 months, working 5 days/week. While our field <br />technician will not be needed on-site on a full-time basis for this duration, we have included limited technician man-hours <br />to allow for periods of "standing by" during compaction, travel portal-to-portal, soil and concrete sample pick-up, etc. <br />Senior Field Technician; 75 hours @ $55.00/hr................................ I .......... $4,125.00 <br />Density Testing <br />► Stabilized Shoulders - 90 tests @ $23.00/test............................................ $2,070.00 <br />► Turnout and Driveway - 60 tests @ $23.00/test.......................................... $1,380.00 <br />► Drainage/Sidewalks/Curbs - 40 tests @ $23.00/test....................................... $920.00 <br />Soil Laboratory Testing: <br />► LBR (stabilized shoulders and misc. base rock); 8 tests @ $295.00/test....................... $2,360.00 <br />► 5 Proctor (Moisture/Density Relationship) Tests @ $85.00/test ............................. $425.00 <br />Concrete Compressive Strength Testing: <br />► Sidewalks, Curbing and Driveway Reconstruction: <br />12 sets of concrete specimens @ $85.00/set......................................... $1,020.00 <br />Roadway Corine and Asphalt Testing: <br />► Three (3) coring mobilizations @ $100.00/day........................................... $300.00 <br />► Core machine rental; 3 days @ $150.00/day.............................................. $450.00 <br />► Generator rental; 3 days @ $50.00/day.................................................. $150.00 <br />► Senior Field Technician (for Roadway Coring - 2 techs required for all coring); <br />- 3 events x 6 hours/event @ $55.00/hour............................................... $990.00 <br />► Extraction/Gradation/Asphalt Content testing of bulk samples; 3 tests @ $190.00/sample ....... $570.00 <br />► Specific Gravity of Asphalt Cores; 9 cores (3 samples obtained for each event) @ $35.00/core .... $315.00 <br />