Laserfiche WebLink
CR 512 RESURFACING - FROM MYRTLE ST. TO 125"' AVE. Page -5- <br />IRC PRojECT No. 1305 <br />AACE Proposal No. P18-1117 <br />TERMS AND CONDITIONS <br />(1) For non-full time or hourly projects, a minimum of 4 density tests will need to be performed per hour, per visit <br />to the site. <br />(2) Stand-by time will be charged at $55.00/hour per technician ($82.50/hour for after-hours, holidays and/or <br />weekend testing services). <br />(3) We note that density testing frequencies are based on our experience with similar projects and anticipated <br />contractor methodologies. Allowances for re-tests (from failing density tests) are not included herein. <br />(4) The contractor should contact Andersen Andre Consulting Engineers, Inc. at (772) 807-9191 a minimum of 24 <br />hours prior to any testing and 48 hours prior to weekend and evening work. <br />(5) Unit rates apply to standard working days, Monday through Friday, 7:00 a.m to 6:00 p.m. Testing and hourly <br />rates will be increased by 50% for weekend, holiday or after-hours services. <br />(6) If our testing estimate for a specific work element is insufficient for that particular activity, resources from <br />another work element can be used without prior authorization from the client as long as our total cost estimate <br />is not exceeded. We will notify you in advance if it appears that the cost estimate presented in the attached unit <br />fee schedule will be exceeded. <br />(7) Soil sample and concrete cylinder pickup for laboratory testing (e.g., Proctor, LBR testing, compressive strength, <br />etc.) will be billed at $55.00/hour if not scheduled with other work. <br />(8) AACE's budget is based upon the construction schedule stated herein. If this schedule changes (i.e., weekend <br />work, evening work, or if the project takes longer than the anticipated duration), this proposal will likely require <br />modification to include additional man -hours to accommodate such changes. <br />(9) AACE's field technicians and engineers do not direct or witness the performance of any work. Neither the <br />presence of an AACE representative on-site not the observation and testing performed by our firm implies <br />AACE's responsibility for defects discovered in the construction work. <br />(10) AACE will not be responsible for job or site safety for this project; job site safety will be the sole responsibility <br />of the contractor. Further, our services do not include reviewing, monitoring or reporting any aspect of the <br />required Maintenance of Traffic (M.O.T.) that may be required for this project. <br />(11) Demolition of existing strain pole foundations will be observed by others. If it is desired to have AACE confirm <br />this scope item, we would be pleased to revise this proposal. <br />(12) AACE will not have stop-work authority. Should our representatives encounter materials or workmanship that, <br />either based on direct testing or on our experience with similar projects, does not appear to meet the engineering <br />plans and specifications we will notify Indian River County immediately. Results will not be relayed to the <br />Contractor without prior consent of the County. <br />(13) No FDOT density (earthwork) log book is required for this project, nor are testing results required to be entered <br />into the FDOT's M.A.C. database. <br />