My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-177
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:58:36 AM
Creation date
9/21/2018 11:59:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/18/2018
Control Number
2018-177.
Agenda Item Number
8.F.
Entity Name
MBV Engineering
Subject
Public Use Improvements Pavillion and Restroom Building Architectural Services
Amedment 1 to Work order number 5
Area
Jones Pier Conservation Area
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - SCOPE OF WORK <br />It is our understanding that the COUNTY intends to construct an approximately 1,040 SF open pavilion <br />with bathrooms at the Jones Pier Historic parcel located at 7770 Jungle Trail, Vero Beach, FL. <br />The proposed improvements will consist of architectural design services, survey services and civil <br />coordination for the design, permitting and CA services for the structures. As such, Donadio & <br />Associates, Architects, P.A. will be retained by MBV Engineering, Inc. to provide the necessary <br />architectural design services for the pavilion and bathroom structure and as further described below <br />in the Scope of Services. MBV Engineering, Inc. will provide the necessary project oversight, additional <br />civil coordination and plan revisions for the watermain as necessary to support the architectural plans <br />development and permitting of this structure. A description for each service is provided in below in <br />further detail. <br />Design Services <br />1. Architectural Design <br />• Establishment of design criteria for the development of the proposed new 1040 SF Pavilion. <br />• On-site visit for field verification of the existing site conditions. <br />• Preparation of architectural construction documents consisting of floor plans, elevations, <br />roof plans and details, life safety plan, code review, schedules, general/construction details, <br />notes and specifications. <br />• Coordination with MEP and Structural. <br />• Coordination with Owners Civil Engineer. <br />• Preparation of Documents for Building Permit Submittal. <br />• Responding to Building Permit review comments. <br />• Preparation of (1) Cost Estimate for each building <br />2. Mechanical / Electrical Engineering (MEP) Design <br />• Coordination with Donadio & Associates, Architects, P.A. <br />• Establish design criteria for ventilation, electrical and plumbing. <br />• Construction documents and specifications for electrical and plumbing, which include but <br />are not limited to: floor plans, schedules, electrical and plumbing risers, electrical panels, <br />reflected ceiling plans, details, etc. <br />• Utility coordination for new electrical service. <br />• Preparation of Documents for Building Permit Submittal. <br />• Responding to Building Permit review comments. <br />3. Structural Design <br />• Coordination with Donadio & Associates, P.A. <br />• Establish structural design criteria <br />• Review of soil investigative reports as provided by Owner. <br />• Design and preparation of the following: <br />D Foundation plans and sections based on a conventional shallow foundation system with <br />a minimum allowable soil bearing pressure of 2,000 psf. <br />o Roof framing plan and sections. <br />o Wind design pressures. <br />• Structural specifications in short format on plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.