My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-177
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:58:36 AM
Creation date
9/21/2018 11:59:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/18/2018
Control Number
2018-177.
Agenda Item Number
8.F.
Entity Name
MBV Engineering
Subject
Public Use Improvements Pavillion and Restroom Building Architectural Services
Amedment 1 to Work order number 5
Area
Jones Pier Conservation Area
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Building and Wall Sections, Roof Framing Plans, Details and Specifications. <br />• Preparation of Documents for Building Permit Submittal. <br />• Responding to Building Permit review comments. <br />4. Civil Design and Oversight <br />Consultant will provide design services to support Architect in development of structures as <br />stated under Task 2. Items associated with this task are listed below: <br />• Coordination with project Architect and MEP <br />• Coordination with IRC Parks Division <br />• (1) Revision to previously designed Civil documents for relocation and / or reorientation of <br />open pavilion / restroom building should Architect and IRC Parks Division deem appropriate <br />• Modification to Civil documents to incorporate off-site 6" Watermain design and Fire <br />Hydrant and Fire Hydrant permitting <br />• Provide overall project oversight throughout project timeline <br />• Bidding Assistance and Coordination <br />This Work Order assumes the proposed pavilion structure will be in conformance with the <br />pavilion structure as depicted in the Phase I Civil documents and not increase in size by more <br />than 15%. <br />The Consultant will not be responsible for any permit fees associated with the project. <br />5. Surveying and Mapping Services <br />Route Survey of a portion of the east side of Jungle Trail and the north side of Morningside <br />Drive/77th Place along Lots 1, 3, 5, 7, 9 and 11, Riverside Estates Sub (PB15-50) as shown on <br />furnished sketch: Establish Horizontal and Vertical Control; Establish Subdivsion control; <br />establish east right of way of Jungle Trail and north right of way/south lot lines of Morningside <br />Drive (along lots list previously); observe topographic features, improvements, trees and <br />vegetation in this area from centerline of road to 20± feet north; locate well, water service (if <br />visible) for each residence and identify house number <br />6. County Reviews <br />The Consultant will coordinate with the COUNTY staff during design development and conduct <br />reviews at 30, 60 and 90 completion phases. COUNTY Parks Division staff shall provide review <br />comments to Consultant in order for Consultant to be able to incorporate into the design plans <br />package. <br />7. Construction Cost Estimate <br />The Consultant will prepare one Conceptual Cost Estimate to assist COUNTY with preliminary <br />budget assistance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.